Bill of quantities
A bill of quantities for every trade, built from the drawings and specification.
CIM reads the drawings and the specification into a scope of works for each trade, then measures the quantities against it to build that trade's bill of quantities. Every line carries its unit, its quantity and the sheet or clause it came from. The estimator adds rates, checks the lines that matter and sends the BoQ to market with the trade package.
Book a briefing| Item | Unit | Qty | Source |
|---|---|---|---|
| W1 partition, full height | m² | 579.4 | A-1103 · Spec 09 21 |
| W3 acoustic partition, Rw 45 | m² | 232.7 | A-1103 · Acoustic rpt §4 |
| Bulkhead, 13 mm on suspended grid | m | 48.0 | A-3201 |
| Access panels, 600 × 600 | no. | 12 | RCP L3 |
| Shaft wall to riser R2 | m² | Not measured | Spec 09 21 §3.4 |
Trade
Plasterboard and partitions
Scope items
- Measured 17
- No quantity yet 1
One trade's bill, each line under its scope item with the unit, the quantity and the source.
The old way
The BoQ is the slowest document in the tender
Quantities and scope live in different files
The takeoff sits in one spreadsheet and the scope in another, and the gap between them is where items go missing.
Subcontractors price their own quantities
Without a BoQ, each subcontractor measures the job their own way, and the quotes can't be compared on the same basis.
A quantity surveyor isn't always available
On smaller jobs and tight tender periods, the BoQ gets skipped or rushed.
With CIM
A BoQ per trade, with the source behind every line
One BoQ per trade, tied to the scope
Each line in the bill sits under the scope item it measures, so a scope item with no quantity stands out.
Units, quantities and the source sheet on every line
m, m², m³ and counts, each cited to the drawing or specification clause it came from.
Exports to Excel for rates and quotes
Add your rates, send the bill out with the trade package, and level the quotes that come back against the same quantities.