← Back to blog
6 min read

How do I compare 2 drawing revisions and find every change?

3 ways to compare drawing revisions: by hand against the transmittal, with a PDF overlay, and with AI across the whole set. The steps for each, what each one misses, and what to do with a change once you've found it.

TL;DR: To find every change between 2 drawing revisions, compare every sheet in the new set against its previous issue, whether or not the transmittal lists it or the consultant clouded it. You can do that by hand, with a PDF overlay, or with AI that reads the whole set in one run. Whichever method you use, log each change against the revision it arrived in and decide whether it affects scope, procurement or work already underway.

Why is the transmittal a poor guide to what changed?

Rev C lands at 3pm. The transmittal lists 14 sheets and the set has 210.

The transmittal tells you which sheets the consultant says changed. The clouds tell you which changes the consultant meant to make. Neither covers a note rewritten on a sheet that wasn't listed, or a wall type that changed in the legend and flowed onto 3 plans with no cloud. More on that in what is a revision cloud.

So the safe comparison covers every sheet.

How do I compare revisions by hand?

  1. Build the sheet list. Match every sheet in the new set to its previous issue by sheet number, and note sheets that are new, withdrawn or renumbered. Your drawing register should already hold this.
  2. Start with the transmittal sheets. Open old and new side by side at the same zoom.
  3. Read the title block and revision table first. The revision description often names the change.
  4. Check each cloud, then read the rest of the sheet anyway. Go zone by zone using the grid lines so you don't skip a corner.
  5. Read the text as well as the linework. General notes, legends, schedules and tags carry changes that don't move a single line.
  6. Repeat for the sheets the transmittal didn't list.
  7. Log each change with the sheet, the revision, a 1-line description and who needs to know.

The catch is step 6. On 210 sheets it takes days, so most teams sample - the structural sheets and the wet areas get compared and the rest go through on trust.

How do I compare revisions with an overlay?

An overlay stacks the 2 issues so the differences show up in colour. It's the quickest way to see what moved on a single sheet.

Bluebeam's support article describes 2 tools in Revu. Compare Documents highlights the differences between 2 PDFs with cloud markups. Overlay Pages merges the PDFs and shows edited content in a separate colour, and Bluebeam says it doesn't work with scanned PDFs.

  1. Match the sheet pairs, as in the manual method.
  2. Run the overlay or compare on each pair.
  3. Check the alignment. If the sheet was re-plotted at a different scale or shifted on the page, everything lights up, so align it on 2 or 3 fixed points such as grid intersections.
  4. Zoom into each coloured area and read both versions. The colour shows where the sheets differ. You still decide what the difference means.
  5. Look hard at schedules and notes. A fire rating changing in 1 cell of a door schedule is a few pixels of colour on an A1 sheet.
  6. Log each change, as above.

Someone still opens every pair and reads every coloured area, and the record is whatever that person writes down. There's a fuller comparison in AI drawing review vs a Bluebeam overlay.

How do I compare revisions with AI?

AI comparison reads both issues of every sheet and lists the changes it detects, so the person's time goes on checking findings.

  1. Load both sets, or connect the document platform so the new revision comes in when it's issued.
  2. Check the sheet matching. A sheet that didn't pair with a previous issue hasn't been compared, so look for gaps in coverage first.
  3. Tell it what matters on this job if the tool allows it - slab levels, fire ratings, wall types.
  4. Open each detected change against the earlier and later sheet. Check the geometry, dimensions, annotations and nearby references before you rely on it.
  5. Triage each one. Reviewed, needs action, or RFI.
  6. Keep the run. The date, the inputs and the results are your record of what was compared.

In CIM Build, revision tracking brings matched drawing pairs, comparison status and detected findings into one review workflow. Bulk compare runs a whole set in one pass on an instruction you write in plain English, 400 sheets in one run, and keeps every run with its date, inputs and results. Changes land in a register with the sheet and revision they came from, an owner and a status.

Can AI automatically cloud what changed walks through an example.

Which method should I use?

By handOverlayAI
Good forA handful of sheets1 sheet pair at a timeThe whole set
Finds unclouded changesIf you read the whole sheetIf you read every coloured areaYes, then a person confirms
Covers unlisted sheetsOnly if you open themOnly if you open themEvery matched sheet
Record of the comparisonWhat you write downWhat you write downThe saved run and register

Plenty of teams use an overlay for the sheet in front of them and a whole-set comparison for the 196 sheets nobody listed.

What do I do with a change once I've found it?

Ask 3 questions.

Does it change scope? If it does, the affected quantities need re-measuring. Here's how to update a takeoff after a drawing revision.

Does it touch a package already let, or work already built? Then the subcontractor and site need to hear about it this week.

Did it add scope after contract? Then it may be a variation the builder can claim. Finding the change doesn't give you the entitlement. Your contract sets the notice period and the process, so check it and get advice if the wording isn't clear.

Book a briefing and bring the previous and current sets.

Frequently asked questions

Can I rely on revision clouds to find the changes? Use them as a starting point. Clouds show the changes the consultant chose to mark, and a change can flow onto other sheets that go out unclouded. Compare the whole sheet, and the sheets the transmittal didn't list.

How do I compare revisions of a specification? Use a text compare on the 2 PDFs or Word files and read every changed clause, because a spec can change while the drawings look identical. More in will AI catch a specification change between revisions.

How long does a full set comparison take? By hand, a set of a few hundred sheets takes days, which is why it gets sampled. With AI the run takes minutes and the person's time goes on checking the detected changes against the source.


Published by CIM Build. This is the text of https://www.cim.build/us/blog/how-to-compare-drawing-revisions without the site design. Index of all pages. Contact.