Customer stories
CIM on live jobs
The discrepancies caught before packages were awarded, and the bids won without the lowest price. Contractors and projects anonymized.
Australia · Commercial construction · Lump sum · $15M
Catching a $50K+ discrepancy before the package was awarded
A three-document coordination error - RW35 required, RW30 scheduled, no seals specified - caught, cited and confirmed before the window package was awarded.
Read the storyAustralia · Commercial interiors · A national contractor · $10M bid won
Winning a $10M job without the lowest price
Full bid set reviewed from day one, the material gaps raised as RFIs, and the saved hours spent on value engineering and the owner. The cheapest bid lost.
Read the story