Feature

Schedule Creator

The schedule built from the drawings, then audited against them.

The master door schedule and the floor plans disagree more often than anyone would like. CIM reads the schedule, locates every door and window on the plans, reconciles the two and audits hardware, fire ratings, acoustic ratings and finishes against the specification. Where no schedule exists, it builds one from the drawings.

CIM Build · Riverside Stage 2 · Door schedule
DoorTypeFRLHardwareStatus
D-104Single, solid core-/60/30HW-3Reconciled
D-118Fire door, exit passage-/60/30HW-7Fire strategy says -/90/30
D-141On plan A-2106Missing from schedule
D-152Sliding, unit entryHW-2Spec hardware changed

This run

  • 184 doors located on the plans
  • 9 on the plans, missing from the schedule
  • 4 ratings against the fire strategy
  • 2 hardware sets against the spec

Re-runs on each revision and exports into your contract admin template.

The schedule reconciled against the plans, with hardware and ratings audited to the spec.

The old way

Two days of cross-referencing, done in full only when someone has two days

  • A door on the plans with no line in the schedule

    Is a door with no hardware, no rating and no price, until the subcontractor finds it on site.

  • The schedule contradicts the life safety plan

    The fire ratings on the schedule and the ratings in the life safety plan drift apart, and the check is a sample at best.

  • It goes stale the moment the next revision lands

    A hardware set changes in the spec and the schedule keeps the old one.

With CIM

Every door and window reconciled to the schedule, on every revision

  • Every door and window reconciled both ways

    Doors on the drawings with no line in the schedule, and lines with no door behind them. Windows and walls run the same way.

  • Ratings and hardware checked to the spec

    Hardware, fire ratings, acoustic ratings and finishes audited against the specification and the life safety plan, each finding referenced to its sheet.

  • A live schedule in your own template

    It re-runs as revisions land and exports into the format your contract admin already uses. Where no schedule exists, CIM builds one.

What it does for your team

  • Builders

    Doors on the plans that never reached the schedule

    Two days of cross-referencing per set, run in minutes and repeated on every revision.

  • Certifiers and surveyors

    Wall schedules against the FRL plans

    Schedules cross-checked against compartment plans and floor plans, with conflicts named.

  • Consultants

    Ratings checked against your own report

    Hardware, fire ratings and acoustic ratings audited against the specification and the fire strategy.

Send your plans and your door schedule. We'll show you what doesn't reconcile.

Book a briefing

Find out what your current set is hiding