AI takeoff software: 8 things to check before you buy
A buyer's checklist for builders comparing AI takeoff and bill of quantities tools: scale calibration, markups, revisions, scope, exports and data residency.
TL;DR: When you compare AI takeoff software, run each tool on a drawing set from a job you have already priced and check 8 things: whether it calibrates scale per sheet, whether every quantity has a markup, how it handles a new revision, whether quantities tie to a scope of works, how it flags what it could not measure, whether it exports to Excel in your format, which drawing sources it connects to, and where your drawings are stored.
Test on a job you already know
Vendor demos use drawings the tool has seen before. Send each tool a set from a recent tender you have already measured, ask for the same quantities, and compare against your own takeoff. Differences tell you more than any feature list.
The 8 checks
1. Scale calibration on every sheet
Ask how the tool sets scale. It should read the scale bar and known dimensions on each sheet and check them against each other, so a sheet printed at a different size is caught. It should refuse, or flag, sheets marked not to scale.
2. A markup behind every quantity
Every number should come with a marked-up copy of the sheet showing what was measured. Without it, the estimator either trusts the number or measures it again.
3. Revisions
Drawings change after the takeoff. Ask what happens when rev D arrives: can the tool compare it against rev C and re-measure only what changed?
4. Quantities tied to scope
A list of quantities is useful. Quantities that sit under the scope item they measure are more useful, because a scope item with no quantity shows up as a gap before the tender closes.
5. What it could not measure
Every set has untagged elements, ambiguous details and sheets out of scale. A good tool lists them. A tool that never flags anything is guessing somewhere.
6. Excel export in your format
The bill will be priced, sent to subcontractors and levelled in a spreadsheet. Check the export carries units, descriptions and sources, and that it fits your template.
7. Where the drawings come from
Check the tool connects to where your sets live: Procore, Aconex, Autodesk Construction Cloud or SharePoint. Re-uploading every revision by hand is where takeoffs drift out of date.
8. Data residency and security
Tender drawings are confidential. Ask where the data is stored and processed, whether it is used to train models, and for the vendor's security documentation.
How CIM Build answers these
- Scale: calibrated on every sheet against the dimensions printed on it.
- Markups: every measurement returned as a table and a marked-up sheet.
- Revisions: revision tracking compares each new issue against the last, sheet by sheet.
- Scope: each bill of quantities line sits under the scope of works item it measures.
- Export: to Excel, ready for rates and quote levelling.
- Sources: Procore, Aconex, Autodesk and SharePoint.
Send us a drawing set from a job you have already priced and we'll run the AI takeoff against it so you can compare.