Feature

Report compliance

Every consultant report, checked against the drawings.

A job carries a stack of consultant reports: geotech, acoustic, ESD, fire, traffic, waste. Each one holds requirements the drawings are meant to have picked up. CIM reads every report against the drawing set and the specification and returns each finding cited to the clause and the sheet.

CIM's report compliance screen: findings from an acoustic report checked against the drawings on the left, each with a level and a confidence, and the acoustic diagram sheet the findings cite on the right.

Findings cited to the clause and the sheet, triaged to reviewed, needs action or RFI.

The old way

Reports get read where someone has the time

  • Half the reports get a skim

    Under tender pressure the team reads the reports it already worries about. A requirement missed in the rest is priced at nothing and paid for in delivery.

  • The cross-reference takes days nobody has

    Rw 35 in the acoustic report against Rw 30 on the drawings. CFA piles in the geotech against bored piles in the structural notes. Found drawing by drawing, or found on site.

  • The finding dies in a marked-up PDF

    What one reviewer caught sits in their markup. The estimator never sees it, and the number goes in without it.

With CIM

Every report audited before the number goes in

  • The week-long read is done in minutes

    All reports run against the drawings and the specification in parallel, with the Principal Project Requirements as its own audit. The BCA/NCC volumes from 2019 to 2025 and the Red Book are preloaded, so the team can query them directly against the job.

  • The reviewer confirms in seconds

    Each finding carries a reference box: the clause, the sheet, the revision. Checking a conclusion replaces hunting for the evidence.

  • The RFI goes out on day two

    Findings triage to reviewed, needs action or future RFI, so the conflict is raised while the consultant can still fix it for free.

What it does for your team

  • Builders

    Price what the reports actually require

    The geotech, acoustic and ESD requirements the drawings never picked up surface before the number is committed.

  • Certifiers and surveyors

    Cross-document checks at volume

    PCA reports, fire engineering reports and drawings checked against each other, on the hundreds of projects a year that come through.

  • Consultants

    The extraction off your senior desks

    Pulling requirements out of a large PDF set is the repetitive half. Your people keep the judgement and the sign-off.

Send us a set and its consultant reports. We'll show you what they contradict.

Book a briefing

Find out what your current set is hiding