Whatever your tender set leaves open, your builder prices as risk or claims later as a variation. CIM reads the set before it goes to market - drawings against specifications, one discipline against another - and flags what is missing while it is still yours to fix.
Where the exposure starts
Every developer pays for the same gaps
You commission the design, issue it to market, and sign a contract that fixes a price against it. From that moment every ambiguity in the set has a value, and the builder is the one who decides what that value is. A detail that stops short, a specification covering two conditions, a discipline never reconciled against another - each comes back as a variation claim, a delay, or a contingency quietly loaded into the price you already accepted.

Where it costs you
You fund the gaps, one claim at a time
What your builder cannot price gets loaded into the number
Assessing a claim from memory means paying to be sure
The gap in your risk register
The bottleneck is human review capacity
Every revision lands as hundreds of sheets, and one person reads them between board papers and site meetings. The gaps slip past the desk and come back as claims you have no basis to refuse, while review capacity stays flat and the project budget absorbs the difference.
Introducing CIM
Scope risk, managed from the brief to practical completion
With CIM, your team gets through the analysis faster and catches more of what matters. Every revision comes back as flagged findings, cited to the page, ready to be signed off and sent straight to the right register - in your spreadsheets or in Aconex, Procore or ACC.
Swipe for the next screen
Design risks · L3 fit-out
Drawings read against the specification
Drawings
- A-301 Rev DLevel 3 plan
- A-501 Rev CWindow schedule
- A-601 Rev DDoor schedule
Specification
- Access cl. 4.2Corridor widths
- Glazing cl. 3.4Glass types by location
- Hardware cl. 5.2Fire door closers
Every sheet read against the clauses it touches. Each conflict lands in the register with the sheet and the clause beside it.
A-301 Rev D · Level 3 plan
Grid C · opened from DR-121
Corridor width at grid C: 1140 mm measured on the sheet, 1200 mm required by cl. 4.2.
Set read 14 Mar, 08:40 - 3 issues against the specification
Six components.
Built as one.
The whole system
Project intelligence, working as one.
Your models, data, Elements, knowledge, safeguards and delivery connect inside one system. Every revision adds context. Every finding brings the evidence with it.
Every component is already at work. Scroll to explore its role in the whole.
Scroll to explore ↓
Outcomes
You stop paying twice for the same missing detail.
The set you issue read end to end before it goes to market
The contract set held as a baseline, every revision compared to it
Their design checked against your brief, clause by clause
A dated record behind every claim you certify
What the industry says
“CIM Build pointed to new opportunities to de-risk project documentation and procurement. It's pleasing to see how the transformation of construction is accelerating now that the serious players have embraced what good looks like. The days of starting projects with only part documentation are now in the rear view mirror.”

David Chandler OAM
Former NSW Building Commissioner
Why we built CIM
“I've sat through too many design meetings where everyone assumed someone else had checked it. Drawings were technically ‘issued’, procurement moved and the risk only showed up once money was already committed. CIM exists to identify those risks early - before they turn into arguments, delays, or margin erosion.”

Kevin Le
Co-Founder of CIM Build · a decade managing construction projects