Scope risk management
The gaps in your documents come back as claims
Whatever your tender set leaves open, your builder prices as risk or claims later as a variation. CIM reads the set before it goes to market - drawings against specifications, one discipline against another - and flags what is missing while it is still yours to fix.
Book a briefingHow it worksTrusted by leading Australian builders
“CIM Build pointed to new opportunities to de-risk project documentation and procurement.”
David Chandler OAMFormer NSW Building CommissionerWhere the exposure starts
Every developer pays for the same gaps
You commission the design, issue it to market, and sign a contract that fixes a price against it. From that moment every ambiguity in the set has a value, and the builder is the one who decides what that value is. A detail that stops short, a specification covering two conditions, a discipline never reconciled against another - each comes back as a variation claim, a delay, or a contingency quietly loaded into the price you already accepted.
Where it costs you
You fund the gaps, one claim at a time
What your builder cannot price gets loaded into the number
Assessing a claim from memory means paying to be sure
The gap in your risk register
The bottleneck is human review capacity
Every revision lands as hundreds of sheets, and one person reads them between board papers and site meetings. The gaps slip past the desk and come back as claims you have no basis to refuse, while review capacity stays flat and the project budget absorbs the difference.
Introducing CIM
Scope risk, managed from the brief to practical completion
With CIM, your team gets through the analysis faster and catches more of what matters. Every revision comes back as flagged findings, cited to the page, ready to be signed off and sent straight to the right register - in your spreadsheets or in Aconex, Procore or ACC.
Design risks · L3 fit-out
Drawings read against the specification
Checked 14 MarDrawings
- A-301 Rev D Level 3 plan
- A-501 Rev C Window schedule
- A-601 Rev D Door schedule
Specification
- Access cl. 4.2 Corridor widths
- Glazing cl. 3.4 Glass types by location
- Hardware cl. 5.2 Fire door closers
Every sheet read against the clauses it touches. Each conflict lands in the register with the sheet and the clause beside it.
A-301 Rev D · Level 3 plan
Grid C · opened from DR-121
ConflictCorridor width at grid C: 1140 mm measured on the sheet, 1200 mm required by cl. 4.2.
Set read 14 Mar, 08:40 - 3 issues against the specification
Issues across drawings and specifications identifiedSwipe for the next screen
Issues across drawings and specifications identified Scope creep between revisions gets picked up Scope of works, RFIs and notices drafted for youDesign risks · L3 fit-out
Drawings read against the specification
Checked 14 MarDrawings
- A-301 Rev D Level 3 plan
- A-501 Rev C Window schedule
- A-601 Rev D Door schedule
Specification
- Access cl. 4.2 Corridor widths
- Glazing cl. 3.4 Glass types by location
- Hardware cl. 5.2 Fire door closers
Every sheet read against the clauses it touches. Each conflict lands in the register with the sheet and the clause beside it.
A-301 Rev D · Level 3 plan
Grid C · opened from DR-121
ConflictCorridor width at grid C: 1140 mm measured on the sheet, 1200 mm required by cl. 4.2.
Set read 14 Mar, 08:40 - 3 issues against the specification
Outcomes
You stop paying twice for the same missing detail.
The set you issue read end to end before it goes to market
Brief a complete tender→The contract set held as a baseline, every revision compared to it
Test every claim→Their design checked against your brief, clause by clause
Hold the builder to the brief→A dated record behind every claim you certify
Certify what you pay for→What the industry says
“CIM Build pointed to new opportunities to de-risk project documentation and procurement. It's pleasing to see how the transformation of construction is accelerating now that the serious players have embraced what good looks like. The days of starting projects with only part documentation are now in the rear view mirror.”
David Chandler OAM
Former NSW Building Commissioner
Why we built CIM
“I've sat through too many design meetings where everyone assumed someone else had checked it. Drawings were technically ‘issued’, procurement moved and the risk only showed up once money was already committed. CIM exists to identify those risks early - before they turn into arguments, delays, or margin erosion.”
Kevin Le
Co-Founder of CIM Build · a decade managing construction projects