← Back to blog
5 min read

Can AI check drawings against the NCC accurately enough to rely on?

An AI code check reads every sheet against the NCC provisions for the building's class and construction type, and cites the clause, the sheet and the revision on every finding. Here's what you can rely on it for, and where the certifier, Performance Solutions and state variations come in.

TL;DR: Yes, for the first pass. An AI code check can read every sheet against the NCC provisions that apply to the building's class and construction type, and cite the clause, the sheet and the revision behind each finding so a person can confirm it against the source. The certifier or building surveyor still decides compliance, Performance Solutions need an expert's assessment, and state and territory variations change what applies. CIM Build's BCA assessment works this way, with the BCA/NCC volumes from 2019 to 2025 preloaded.

Sheet 3 of a 180-sheet set gets the best read anyone will give it. Sheet 180 gets whatever's left on a Thursday night, and a miss there costs the same.

An AI code check gives every sheet the same read. You can rely on it to find problems and show you where they are. The decision on compliance stays with people.

What does an AI NCC check do?

Only a fraction of the NCC applies to any single sheet, and working out which fraction is the job.

So a code check starts from the building's class and construction type, works out which provisions apply, and reads every sheet in the set against them. Each finding should come back with the clause, the sheet and the revision, and the measurement drawn where it was taken.

Here's a synthetic example. A Class 2 apartment floor on sheet A-2104 rev C, with the corridor to the fire stair dimensioned at 950 mm. Clause D2D8 of NCC 2025 Volume One asks for at least 1 m of unobstructed width on a path of travel to an exit. The finding names D2D8, A-2104 and rev C, and draws the 950 mm on the sheet.

A reviewer can open that and confirm it in seconds. A finding with no clause and no sheet behind it gets trusted or checked again from scratch, and both cost you.

What can you rely on it for?

4 things, as long as every finding is cited.

It works out the provisions. On a manual assessment the first day goes to finding which clauses apply to this building, before anyone reads a sheet.

It reads every sheet to the same standard, including the ones at the back of the set that usually get the thinnest read.

Reissues get the same treatment. A new issue usually means the read from the top again, and a check that re-runs takes minutes.

And it leaves a record of what was read, against which clause, on which revision.

Who signs off on NCC compliance?

The certifier or building surveyor, depending on the state.

The ABCB's roles and responsibilities page has certifiers reviewing plans and inspecting work to confirm compliance. Building surveyors assess plans against the NCC and the state or territory's building legislation. The same page puts designing and building to the NCC on the designers, architects and builders. On a design and construct (D&C) job, that's partly you.

So an AI code check works for the design team and the builder. It puts a cited list of problems in front of you before the certifier finds them, and the certifier still makes the call.

What about Performance Solutions?

The NCC lets a design meet its Performance Requirements with a Deemed-to-Satisfy Solution, a Performance Solution or a combination of the 2 (clause A2G1 of NCC 2025 Volume One).

A Performance Solution has to be shown to comply through the NCC's Assessment Methods - evidence of suitability, a Verification Method, Expert Judgement or a comparison with the Deemed-to-Satisfy Provisions (A2G2).

So when a fire engineer extends a travel distance on the strength of sprinklers, the drawings won't match the Deemed-to-Satisfy number. A check against the Deemed-to-Satisfy Provisions will flag it. Triage that finding against the engineer's report. Whether the solution works is the engineer's assessment and the certifier's approval.

The drawings still have to carry every condition the report relies on. That's a separate check, and we wrote up how to run it for fire engineering reports.

Do the NCC edition and state variations change the check?

Yes. Right now it depends which state you're in.

NCC 2025 was published on 1 May 2026. Victoria adopted it from that day. NSW and Queensland adopt it on 1 May 2027, and the Northern Territory hasn't adopted it.

On top of the edition, each state and territory has its own variations, set out in a schedule of NCC Volume One. NSW's is Schedule 5. The ABCB's adoption page notes that some requirements may apply at different times, or not at all, because of them.

So settle the edition and the state before anyone reads a finding, and ask any tool how it handles both.

How CIM Build does it

CIM Build calls it BCA assessment. The BCA is Volumes One and Two of the NCC.

It assesses the architectural set against the provisions that apply to the building's class and construction type, and cites the clause, the sheet and the revision behind every finding. The measurement is drawn where it was taken. The whole set is assessed in minutes.

The BCA/NCC volumes from 2019 to 2025 and the Red Book are preloaded, so the team can query them directly against the job.

The assessment re-runs on each issue. Senior time goes to the findings that need judgement, and what was read is on record.

The team triages each finding as reviewed, needs action or RFI, and nothing goes to a consultant until a person sends it.

Australian Standards beyond the NCC are a separate question, covered in can AI drawing review check Australian Standards.

Send us a set and we'll assess it against the code and show you the clause behind every finding.

Frequently asked questions

Can AI replace the building certifier? No. The certifier or building surveyor carries the statutory responsibility to decide building compliance, and the NCC glossary describes the appropriate authority as typically that person. An AI code check gets a cited list in front of the design team and the builder earlier.

Which NCC editions does CIM Build check against? The BCA/NCC volumes from 2019 to 2025 and the Red Book are preloaded, so the team can query them directly against the job.

How long does an AI NCC check take? CIM Build assesses the whole set in minutes. Confirming the findings takes a person's time, which is why every finding carries the clause, the sheet and the revision.


Published by CIM Build. This is the text of https://www.cim.build/us/blog/ai-ncc-compliance-check without the site design. Index of all pages. Contact.