How long does a manual takeoff take compared with AI takeoff?

There's no standard figure for either. Where the hours go in a manual takeoff, which of them AI takeoff removes, which it leaves with the estimator, and how to time both on a tender you've already priced.

TL;DR: There's no standard figure for either, because takeoff time depends on how many sheets and trades are in the set and how well it's drawn. On a mid-size tender the manual measuring commonly runs to days of tracing and counting before any pricing starts. With AI takeoff the software does the measuring, and the estimator's time goes into checking the markup on the lines that carry the most cost. Time both on a tender you've already priced and you'll have your own number.

It's Wednesday, the tender closes Friday week, and the estimator is still on Level 2 partitions.

Nothing's gone wrong. That's what measuring 30 trades off a PDF set by hand looks like, and the pricing can't start until it's done.

Where do the hours go in a manual takeoff?

Break a manual takeoff into its jobs and the time sits in 5 places.

  1. Finding the sheets. Wall lengths come off the floor plans, bulkheads off the reflected ceiling plans, door counts off the schedule and the plans. Somebody has to work out which sheets carry which trade.
  2. Setting the scale. Sheet by sheet, against a printed dimension. Skip it on 1 reduced sheet and everything measured there is wrong.
  3. Tracing and counting. Every wall run clicked, every area closed, every door and fixture ticked. This is the bulk of it.
  4. Sorting the numbers. Quantities get grouped by type, level and trade, then typed or pasted into the estimating spreadsheet with a description and a unit.
  5. Checking. Somebody opens the biggest lines and looks at what was traced. Under pressure this is the step that gets cut.

And then a revision lands and parts of 1 to 5 happen again.

Why is there no standard time for a takeoff?

Because the same building can take very different time depending on the set.

Say an 84-apartment job over 6 storeys. If 4 of the floors are truly typical, you measure 1 and multiply. If each floor has a slightly different layout, you measure all 6. Same building, very different week.

The things that move the time most:

So any figure you read for "a typical takeoff" is somebody else's set and somebody else's estimator. I wouldn't plan a tender around it.

What changes with AI takeoff?

The estimator asks for the quantity and the software does jobs 1 to 4.

A request reads like an instruction to a cadet - measure the internal wall lengths on Level 3 by wall type. The software finds the sheets, calibrates the scale on each one, measures, groups the results and returns a table with a marked-up copy of the sheet. There's more on the mechanics in what is AI takeoff.

Job 5 stays with the estimator, and it gets bigger. You're now checking a whole takeoff you didn't measure, so you check it the way you'd check a junior's. Open the markup on the 3 or 4 lines that carry the most cost, re-measure 1 yourself, and look at what the tool flagged. The full list is in how to check a quantity takeoff.

Revisions change too. A re-run on the new set gives you fresh quantities to compare against the old ones, and you look at the lines that moved.

What doesn't get faster?

Some of the work is judgement, and that takes the time it takes.

If a tool gives you quantities with no markup behind them, checking means measuring again, and most of the time you saved goes back in.

How do I time it on my own tender?

Use a tender you've already priced, where you trust your quantities and you remember roughly how long the measuring took.

  1. Pick 3 trades that carried real money, say internal walls, ceilings and doors.
  2. Write down how long the manual measure took for those trades. An honest estimate from the estimator who did it is fine.
  3. Run the same trades through the AI takeoff tool. Time the run and time the check separately.
  4. Compare the quantities on the biggest cost lines against the ones you priced.
  5. Load the revision that came out during that tender and time the re-run and the comparison.

Add the run time and the check time together. That total against your manual figure is the only speed number worth taking to a director, because it's your set and your people.

How does CIM Build handle it?

CIM Build's AI takeoff takes a plain-English request, calibrates each sheet's scale against the dimensions printed on it, measures with code and returns a results table with a marked-up copy of the sheet.

The quantities feed a bill of quantities for each trade, with the unit, the quantity and the source sheet or clause on every line, and it exports to Excel. The estimator decides what's priced and signs it off.

Book a briefing and bring the tender.

Frequently asked questions

Is AI takeoff faster than a manual takeoff? The measuring is, because software does it. The total depends on how long the check takes, and that depends on whether every quantity comes back with a markup you can open. Time the run and the check together on a tender you've already priced.

Does checking an AI takeoff take as long as measuring it? It shouldn't if the tool marks up every measurement on the sheet. You open the biggest cost lines, look at what was traced and re-measure 1 of them. With no markup, the only check is to measure again.

Will AI takeoff mean fewer estimators? It moves the estimator's hours from tracing to checking, scope and pricing. The estimator still decides what gets measured and what gets priced. More in will AI replace estimators.