What is a door schedule in commercial construction?
Learn what a commercial door schedule lists, how estimators check missing ratings and hardware against floor plans, and how to test one on a live bid set.
A construction door schedule is a structured table, typically prepared by the project architect or compiled by the builder from project drawings, that itemizes every door on a project by its mark, location, scheduled size, door and frame type, ratings, and hardware group. Estimators and preconstruction teams use the door schedule alongside architectural floor plans, the project manual, and consultant reports to price doors, frames, seals, and hardware before awarding subcontracts or releasing shop drawings.
What a construction door schedule includes
A complete door schedule ties every door mark on the architectural floor plans to the specification and procurement details required to price and order the assembly. As documented in Autodesk Revit's door schedule reference, schedules itemize model doors by instance and can be grouped or filtered by level to support quantity and cost work.
Commercial estimating teams expect a bid-set door schedule to carry 7 core fields:
- Door mark and location: A unique tag such as
D#01paired with the level and room or area so each row maps back to a drawn opening. - Scheduled dimensions: Nominal leaf or opening width, height, and thickness as scheduled on the architectural sheet.
- Door and frame type: Core construction, glazing lites, finish, frame material, and jamb profile.
- Fire rating: Required fire-resistance rating and gasketing where specified by the architect or fire consultant.
- Acoustic rating: Required sound-control rating and perimeter or drop seals where specified by the acoustic report.
- Hardware group: Locksets, hinges, closers, access-control interfaces, and kickplates linked to the hardware specification.
- Remarks and detail references: Undercuts, threshold details, glazing notes, and references to door elevation or head-and-jamb detail sheets.
Authoring tools allow design teams to filter door schedule fields by level, phase, fire rating, or custom parameters when that data is populated. Blank or unconfirmed cells are common during bidding, and spotting them early prevents unpriced upgrades from turning into change orders during construction.
Worked door schedule example
A bid-set door schedule rarely arrives with every column complete. The plan extract and table below show 3 scheduled doors from an anonymized residential unit plan, with every unconfirmed attribute kept visible. The source drawing set uses metric millimeters.

Illustrative reconstruction.
| Door tag | Location | Scheduled size | Fire rating | Acoustic rating | Hardware | Review status |
|---|---|---|---|---|---|---|
| D#01 | Entry | 870 × 2400 mm | To confirm | To confirm | To confirm | Confirm fire, acoustic, and hardware requirements before pricing |
| D#09 | Bedroom | 920 × 2400 mm | To confirm | To confirm | To confirm | Confirm leaf core, acoustic seals, and hardware group |
| D#13 | Ensuite | 720 × 2400 mm | To confirm | To confirm | To confirm | Confirm moisture-resistant finish and privacy hardware group |
The 3 scheduled sizes (870 × 2400 mm, 920 × 2400 mm, and 720 × 2400 mm) give an estimator an initial count and nominal size list. Those figures are scheduled sizes from the source door schedule. Before pricing or ordering frames, confirm whether each scheduled size states leaf, frame, or rough opening dimensions and reconcile it with the frame profile, clearances, and drawn drywall partition framing.
Fire rating, acoustic rating, and hardware all read To confirm. A room name alone cannot establish whether an opening requires a fire rating, acoustic seals, or specific hardware. Applying a unit rate for a hollow-core door with basic lever hardware when the project manual or a consultant report later requires a solid-core, fire-rated, or acoustically sealed assembly creates a direct bid gap and change-order exposure.
Practical checks before bidding and procurement
Before issuing a doors, frames, and hardware bid package or finalizing unit rates, run 5 checks across the bid set:
- Reconcile every mark between plans and schedule. Confirm that every door drawn on the floor plans appears on the door schedule and that no scheduled row is orphaned from the plans.
- Verify room location and door swing on the floor plan. Schedule room labels can drift after late drawing revisions. Autodesk's room information guidance for door schedules warns that
From RoomandTo Roomfields do not automatically update after later door-swing changes, so check swing direction and room adjacency directly on the current plan. - Reconcile scheduled sizes with the dimension basis and opening details. Confirm whether scheduled widths and heights state leaf, frame, or rough opening dimensions, then reconcile them with the frame profile, clearances, installation tolerances, headers, and ceiling heights shown on architectural and structural sheets.
- Cross-check ratings against consultant reports and the project manual. Compare the door schedule against the fire report, acoustic report, Owner's Project Requirements (OPR), and specification sections so missing ratings or conflicting gasketing requirements surface before award.
- Confirm hardware and trade interfaces. Check which trade furnishes and installs frames, doors, hardware, low-voltage access-control rough-in, and painting. Clear trade boundaries belong in your scope of work.
Checking door schedules with CIM Build
Estimators and preconstruction teams normally reconcile door schedules against floor plans, the project manual, and consultant reports sheet by sheet in PDFs and spreadsheets. CIM Build's preconstruction modules operate as an AI-first service that delivers results in hours through interactive software with visible workings and verifiable measurements, depending on pack size, document quality, and review scope.
CIM Build extracts the door schedule, locates door marks on drawings, and links written report and specification requirements so your team inspects schedule rows alongside marked-up 2D sheets and linked 3D elements where drawn without repeating the whole takeoff themselves, while source review and estimator judgment remain with your team.
- Start the schedule or review run. A person starts schedule extraction for the door schedule. When checks against consultant reports, the project manual, or Owner's Project Requirements are needed, the team separately starts a scoped requirements review.
- Get source-linked rows and cited findings. CIM Build extracts the door schedule, locates door marks on drawings, and returns source-linked rows. A separate written-requirement review checks those sections against the drawings and cites conflicts or gaps so estimators check door packages faster before bid pricing and procurement.
- Review, export, or issue an RFI. Your team inspects incomplete or conflicting evidence and exports the reviewed schedule to Excel, CSV, or PDF. When you choose to raise an issue, CIM Build drafts the RFI, and your reviewer edits it, selects recipients, and issues it by email or connected Procore RFI or Aconex project mail.
Frequently asked questions
Who prepares the construction door schedule?
The project architect normally prepares and issues the door schedule as part of the architectural drawing set. Hardware consultants, fire engineers, and acoustic consultants supply performance criteria and hardware groups that the architect or commercial builder must reconcile into the complete door package.
Can you price a door bid package from scheduled sizes alone?
No. Scheduled widths and heights give you door counts and nominal leaf sizes, but unit rates depend on door core, frame profile, fire rating, acoustic seals, glazing, and hardware group. Keep unconfirmed fields visible, carry a clear allowance if needed, and issue an RFI before subcontract award.
What should you do when the door schedule and floor plan disagree?
Check the bid instructions or contract order-of-precedence clauses and submit a written RFI citing the exact door mark, schedule revision, and floor plan sheet. Do not assume the floor plan or the schedule governs without design-team confirmation.
Does CIM Build certify fire or acoustic code compliance on a door schedule?
No. CIM Build extracts schedule rows, locates door marks on drawings, and cites matching or missing clauses across project documents. Your team and the design consultants remain responsible for code compliance, ratings, and final sign-off.
How is CIM Build priced for schedule and document checks?
CIM Build is priced per project, with the project price determined by the number of pages we process for that project. Contact CIM Build for a quote on your project.
Test your door schedule on a live bid set
See how a real door schedule holds up against your floor plans, project manual, and consultant reports before bid day. Contact CIM Build to walk through a live bid set with your team.
Send us a live bid set and see what it finds
Your first live bid project comes at a discount. We scope the review with you, run your drawings, schedules, and specifications, and walk through the evidence with your team. Get results in hours inside interactive software where your team can trace sources and verify every measurement and finding. Timing depends on pack size, document quality, and review scope.
Book a demoLeave your contact details first. Our team will follow up to arrange safe document sharing and a walkthrough.