Design risk management

De-risk your design schedule

The budget is set at feasibility and the design develops for 18 months after it. CIM reads every revision against the brief, flags the scope the design has picked up and the design issues still open, and cites each finding to the page. Your design managers close them with the consultants while the drawing is still cheap to change.

Book a briefingHow it works

Trusted by leading Australian builders

“CIM Build pointed to new opportunities to de-risk project documentation and procurement.”
David Chandler OAMDavid Chandler OAMFormer NSW Building Commissioner

Where design risk starts

Every developer-builder carries it alone

You set the budget at feasibility, on a brief and a concept set. Your consultants then develop the design for 18 months, and each revision adds a little: a thicker slab, a different facade system, a bigger services riser. Nobody sends you a change order for any of it, because you are the client and the builder. Your design managers have no claim to push the consultants with, so design issues stay open. The extra cost shows up in the cost report months later, when the change is expensive to undo.

Commercial manager pressing his temples while staring at a screen

Where it costs you

It comes off the return, every time

Scope the design picks up has nowhere to go but your return

A change found late costs rework and the holding time to fix it

Nobody is checking your consultants except you

The gap in your risk register

The bottleneck is human review capacity

Every revision lands as hundreds of sheets, and one person reads them between site walks and consultant meetings. The unclouded changes slip past the desk and surface months later as rework nobody priced and time you carry, while review capacity stays flat and the return absorbs the difference.

Use cases

What developer-builders use CIM for

Check reports against the drawingsCatch changes between revisionsWrite the scope of worksCompare subcontractor quotesMeasure the quantitiesGenerate RFIs from the gapsGenerate door, window and FF&E schedulesReview across disciplinesCheck owner requirements against the electrical package

Check every requirement in your consultant reports against the drawings, with each mismatch cited to the clause and the sheet.

Read more on Report compliance

Also used for

From bid to handover

Shared context across your team

Outcomes

The design stops moving the number without anyone noticing.

What the industry says

“CIM Build pointed to new opportunities to de-risk project documentation and procurement. It's pleasing to see how the transformation of construction is accelerating now that the serious players have embraced what good looks like. The days of starting projects with only part documentation are now in the rear view mirror.”
David Chandler OAM

David Chandler OAM

Former NSW Building Commissioner

Why we built CIM

“I've sat through too many design meetings where everyone assumed someone else had checked it. Drawings were technically ‘issued’, procurement moved and the risk only showed up once money was already committed. CIM exists to identify those risks early - before they turn into arguments, delays, or margin erosion.”
Kevin Le

Kevin Le

Co-Founder of CIM Build · a decade managing construction projects

Questions

Before you ask

All questions
Where is CIM Build's data stored?

CIM Build's standard hosted environment keeps customer data in Australia. The sub-processor list, architecture overview and data processing terms are published at trust.cim.build.

Does CIM Build train AI models on customer documents?

No. Your documents, prompts and configured checks remain yours, they are not used to train models made available to other customers, and you can request deletion at any time and receive written confirmation.

Is CIM Build SOC 2 compliant?

CIM Build attained SOC 2 Type I in July 2026. An independent web application penetration test in June 2026 returned zero critical findings, and all findings have been remediated.

How do I know a finding is right?

Every finding cites the sheet, the clause and the document it came from, so the person reviewing it can open the source and confirm it in seconds. The team triages each finding as reviewed, needs action or RFI, and nothing goes to a consultant until a person sends it.

AI-suggested RFIs
Can ChatGPT or Claude review a full construction document set?

ChatGPT and Claude can read the files you upload to one conversation, and they are useful for drafting and for questions about a single document. CIM Build reads the whole set together, checks each document against the others, cites the sheet and clause for every finding, and runs again on every revision, which is the work a bid review needs.

ChatGPT vs Claude vs Copilot for construction
Will my team rely on the AI instead of learning the job?

CIM Build does the reading and the cross-referencing, and the estimator or design manager makes every call on what a finding means for the price or the schedule. Because each finding links to its source, juniors see exactly where the problem sits in the documents.

How do I try CIM Build on my own project?

Book a briefing and bring a current bid set or a set from a job you know well. The team runs it through CIM Build and walks you through what comes back, cited to your own sheets.