Design risk management
De-risk your design schedule
The budget is set at feasibility and the design develops for 18 months after it. CIM reads every revision against the brief, flags the scope the design has picked up and the design issues still open, and cites each finding to the page. Your design managers close them with the consultants while the drawing is still cheap to change.
Book a briefingHow it worksTrusted by leading Australian builders
“CIM Build pointed to new opportunities to de-risk project documentation and procurement.”
David Chandler OAMFormer NSW Building CommissionerWhere design risk starts
Every developer-builder carries it alone
You set the budget at feasibility, on a brief and a concept set. Your consultants then develop the design for 18 months, and each revision adds a little: a thicker slab, a different facade system, a bigger services riser. Nobody sends you a change order for any of it, because you are the client and the builder. Your design managers have no claim to push the consultants with, so design issues stay open. The extra cost shows up in the cost report months later, when the change is expensive to undo.
Where it costs you
It comes off the return, every time
A change found late costs rework and the holding time to fix it
Nobody is checking your consultants except you
The gap in your risk register
The bottleneck is human review capacity
Every revision lands as hundreds of sheets, and one person reads them between site walks and consultant meetings. The unclouded changes slip past the desk and surface months later as rework nobody priced and time you carry, while review capacity stays flat and the return absorbs the difference.
Use cases
What developer-builders use CIM for
Check reports against the drawingsCatch changes between revisionsWrite the scope of worksCompare subcontractor quotesMeasure the quantitiesGenerate RFIs from the gapsGenerate door, window and FF&E schedulesReview across disciplinesCheck owner requirements against the electrical packageCheck every requirement in your consultant reports against the drawings, with each mismatch cited to the clause and the sheet.
Read more on Report compliance
Also used for
Fire engineering report
Checked against the drawings, down to warning coverage and panel types.
Accessibility report
Turning circles, clearances and fixture heights checked on the plans.
Geotech report
Footings and bearing capacity checked against what the report found.
Façade engineering
The façade report checked against the elevations and details.
Energy and sustainability
Report commitments checked against wall types and the window schedule.
Floor build-ups
Finishes, screeds and set-downs checked so the levels work.
Lift shafts
Shaft dimensions checked against the lift specification.
Single line diagram
Checked against the general arrangement drawings.
Inground hydraulics
Drainage and inground services checked before the slab goes down.
Latent conditions
Existing conditions and demolition scope pulled out of the documents.
Design delegation
Design left for a trade to finish, found before the package is let.
Authority requirements
Water, gas and power connection conditions checked against the design.
From bid to handover
Shared context across your team
Outcomes
The design stops moving the number without anyone noticing.
Every revision checked against the brief you underwrote
Protect your feasibility→Every issue read against your brief and the other disciplines
Hold consultants to the brief→The sales documents checked against the current set
Build what you sold→A dated record of every change, built as the job runs
Shorten your defects tail→What the industry says
“CIM Build pointed to new opportunities to de-risk project documentation and procurement. It's pleasing to see how the transformation of construction is accelerating now that the serious players have embraced what good looks like. The days of starting projects with only part documentation are now in the rear view mirror.”
David Chandler OAM
Former NSW Building Commissioner
Why we built CIM
“I've sat through too many design meetings where everyone assumed someone else had checked it. Drawings were technically ‘issued’, procurement moved and the risk only showed up once money was already committed. CIM exists to identify those risks early - before they turn into arguments, delays, or margin erosion.”
Kevin Le
Co-Founder of CIM Build · a decade managing construction projects
Questions
Before you ask
All questionsWhere is CIM Build's data stored?
CIM Build's standard hosted environment keeps customer data in Australia. The sub-processor list, architecture overview and data processing terms are published at trust.cim.build.
Does CIM Build train AI models on customer documents?
No. Your documents, prompts and configured checks remain yours, they are not used to train models made available to other customers, and you can request deletion at any time and receive written confirmation.
Is CIM Build SOC 2 compliant?
CIM Build attained SOC 2 Type I in July 2026. An independent web application penetration test in June 2026 returned zero critical findings, and all findings have been remediated.
How do I know a finding is right?
Every finding cites the sheet, the clause and the document it came from, so the person reviewing it can open the source and confirm it in seconds. The team triages each finding as reviewed, needs action or RFI, and nothing goes to a consultant until a person sends it.
AI-suggested RFIsCan ChatGPT or Claude review a full construction document set?
ChatGPT and Claude can read the files you upload to one conversation, and they are useful for drafting and for questions about a single document. CIM Build reads the whole set together, checks each document against the others, cites the sheet and clause for every finding, and runs again on every revision, which is the work a bid review needs.
ChatGPT vs Claude vs Copilot for constructionWill my team rely on the AI instead of learning the job?
CIM Build does the reading and the cross-referencing, and the estimator or design manager makes every call on what a finding means for the price or the schedule. Because each finding links to its source, juniors see exactly where the problem sits in the documents.