What is CIM Build?
CIM Build is construction intelligence management software for general contractors, developers and the consultants who work with them. It reads every drawing, specification, consultant report and brief on every revision, checks them against each other and against the IBC, and keeps the findings in live registers with the sheet and clause behind each one.
Product overview →Can ChatGPT or Claude review a full construction document set?
ChatGPT and Claude can read the files you upload to one conversation, and they are useful for drafting and for questions about a single document. CIM Build reads the whole set together, checks each document against the others, cites the sheet and clause for every finding, and runs again on every revision, which is the work a bid review needs.
ChatGPT vs Claude vs Copilot for construction →How does CIM Build check consultant reports against the drawings?
CIM Build reads each consultant report (geotech, acoustic, ESD, fire, traffic, waste) and checks every requirement in it against the drawings and schedules. A fire door scheduled at a lower fire rating than the fire engineering report requires, or a wall drawn at a lower acoustic rating than the acoustic report calls for, comes back as a finding cited to both documents.
Report compliance →How does CIM Build find changes between drawing revisions?
CIM Build compares each new revision against the last one sheet by sheet and lists every change, including the changes nobody clouded. Each change is boxed on the sheet and recorded against the revision it arrived in.
Revision tracking →Can CIM Build level subcontractor quotes?
Yes. CIM Build reads each subcontractor quote against the trade scope from the drawings and specification, lines the quotes up item by item, flags the allowances one quote carries and the others leave out, and exports the comparison to Excel for the estimator to check.
Bid leveling →Does CIM Build check drawings against the OPR?
Yes. CIM Build runs the OPR and the drawing set against each other in both directions on every issue, so a requirement in the brief that the drawings don't show, or a drawn item the brief doesn't allow for, comes back as a finding.
OPR vs the drawings →Which building code editions does CIM Build check against?
The IBC and the state amendments that apply to the job are preloaded, so the team can query them directly.
Code assessment →