Quantity surveying services alternative for measurement and trade quantity lists

CIM Build is an AI-first service that turns 2D bid sets into measured trade quantity lists and written scope checks in hours through interactive software. Inspect visible workings, marked-up 2D sheets, and linked 3D elements where drawn without repeating the whole takeoff while keeping cost consulting judgment with your team. Your first live bid project comes at a discount.

Book a demo

Compare CIM Build against a quantity list you hold

CIM Build · Riverside Stage 2 · Bill of quantities · Plasterboard and partitions
ItemUnitQtySource
W1 partition, full heightm²579.4A-1103 · Spec 09 21
W3 acoustic partition, Rw 45m²232.7A-1103 · Acoustic rpt §4
Bulkhead, 13 mm on suspended gridm48.0A-3201
Access panels, 600 × 600no.12RCP L3
Shaft wall to riser R2m²Not measuredSpec 09 21 §3.4

Trade

Plasterboard and partitions

Scope items

  • Measured 17
  • No quantity yet 1

One trade's bill, each line under its scope item with the unit, the quantity and the source.

Trace a measured BOQ line back to the drawing and 3D model

Open a measured line in the bill of quantities to check the element behind the figure. Select the partition, bedroom, or ensuite below to verify the same item on the 2D plan and in 3D. Click any surrounding element in the model to outline it on the 2D plan and inspect its type, dimensions, and source. The 3D view consolidates plans, elevations, details, and schedules, with specification and report requirements linked where available so your team checks scope, quantities, and sources in context.

Demonstrated from a metric residential drawing set with rounded imperial conversions shown beside the original metric figures for illustration.

2D ground floor plan
3D model view
3D model view
Measured BOQ lines linked to the 2D plan and 3D model. Select a row to highlight the element behind the quantity. Estimators verify sheet scale, heights, and deductions before pricing.
ElementQuantitySource
W6B bedroom/ensuite partition54.0 SF (5.02 m²)Ground floor plan & wall schedule
Bedroom floor (carpet)129.3 SF (12.01 m²)Ground floor plan & room boundary
Ensuite floor (tile)39.1 SF (3.63 m²)Ground floor plan & room boundary

W6B bedroom/ensuite partition 1.598 m plan length × 3.140 m height from storey levels (5.018 m² gross face, one side, converted to 54.0 SF before deductions). Wall runs to storey height above the 2.65 m bedroom ceiling and 2.40 m ensuite ceiling. 3D view shows tile on the ensuite face and paint on the bedroom face for visual verification.

Illustrative reconstruction.

Worked example

Ground Floor mechanical room CMU masonry walls

Illustrative reconstruction.

Measured trade line860 SFEstimator adjustment+60 SFNet trade total920 SF

Source and revision

Plan A-101 Rev B

Interior CMU mechanical room wall area measured from Plan A-101 Rev B alongside Acoustic Report Section 5.2.

What you send and what comes back

In US commercial construction, quantity surveying work is typically handled by cost estimators, preconstruction managers, and independent cost consultants who measure drawings, assemble trade quantity lists, and verify scope across bidding and delivery.

CIM Build is an AI-first service delivered through interactive software. Through CIM Build's preconstruction modules, your team gets that first-pass measurement, structured trade quantity list, written scope check, and visible 2D/3D source linking from 2D bid sets. Cost consulting judgment, unit pricing, and formal sign-off stay with your team or appointed consultant.

Your first live bid project comes at a discount. Our team agrees the review scope with you, runs your live bid set, and walks your estimator through results in hours that you can verify and use. Timing depends on pack size, document quality, and review scope.

Cost estimators can understand the whole project together in one 3D view during quantity verification. Model geometry comes from disparate plans, elevations, details, and schedules, with specification and consultant report requirements linked where available. Trace each measured item back to its 3D element, linked requirements, quantity, and originating source documents.

StageWhat happens
What you send2D drawings, schedules, technical specifications, owner project requirements, and consultant reports
What comes backA structured trade quantity list across lengths, areas, volumes, and counts, with in-scope written items carried beside measured lines and a linked 3D model
How you check itOpen any measured line on its 2D drawing sheet and 3D elements where drawn, review separate measured, adjustment, and net totals as shown in the worked example above, and inspect the per-line change record
Who signs offYour cost estimator, preconstruction lead, or cost consultant reviews conventions, enters unit rates, prices risk, and signs off the bid

How CIM Build compares with an outside cost consultant or QS engagement

Commercial builders and developers engage outside cost consultants or quantity surveyors for independent quantity lists, conceptual budgets, and commercial advice. Separating first-pass measurement from advisory work helps teams compare deliverables clearly and bring structured trade lists onto smaller commercial jobs alongside major projects.

CriterionTypical outside cost consultant or QSCIM Build
What you hand overIssue a scope brief and bid set for off-site measurement and reportingUpload the 2D bid set into your workspace and run schedules, model, and trade quantity list
What you receiveA quantity list, bill of quantities, or cost report prepared to the agreed briefStructured trade quantity list, written scope items, 3D model, and Excel, CSV, or PDF exports for your estimating sheet
How working is shownConfirm whether backup sheets, marked-up drawings, and assumption notes are included in the agreed deliverablesMeasured lines link to their 2D drawing sheet and 3D elements where drawn, with measured quantity, adjustment, and net total held separately
What happens on an addendumRevision allowances and turnaround vary by firm. Confirm how mid-bid addenda are handled in the agreed scopeUpload revised sheets, see flagged lines, regenerate while keeping earlier adjustments, unit rates, and notes on retained lines, and compare two saved internal revisions
Who holds pricing and commercial adviceThe outside consultant provides market pricing, value engineering, and cost reporting within their briefCIM Build measures and structures scope. Cost consulting judgment, unit pricing, and formal sign-off stay with your team or consultant
How it is chargedConfirm the fee basis (fixed fee per milestone, percentage of construction cost, or hourly rate) and inclusions in the scopePriced per project, based on the number of pages processed for that project

How the measurement and quantity-list workflow runs in 3 steps

  1. Your team sets trades and runs the bid set: Upload your 2D drawings, schedules, technical specifications, owner project requirements, and consultant reports, select project trades, run schedules and the 3D model, and generate the trade quantity list.
  2. CIM Build measures and structures trade sections: CIM Build measures located model elements into trade sections and carries in-scope written requirements from your Scope of works register under each trade.
  3. Your team inspects, adjusts, and exports: Review every measured line in 2D and 3D, record separate adjustments, unit rates, factors, and notes with a per-line audit record, save and compare internal revisions, and export to Excel, CSV, or PDF.

Manual measurement and trade-list assembly on complex commercial bids can take weeks. CIM Build delivers first-pass results in hours, depending on pack size, document quality, and review scope. The 2D/3D visual proof above shows an Australian commercial project in metric units to illustrate linked review, while the worked trace example reflects US imperial units.

For a breakdown of how quantity surveying and cost-consultant quotes are structured, read our quantity surveyor cost guide. For full bid pricing preparation and subcontractor bid leveling, see construction estimating. For drawing-level sheet measurement, see construction takeoff. To explore the product workflows in detail, read bill of quantities software and scope of works.

What stays with your cost estimator or consultant

CIM Build produces traceable first-pass measurement, structured trade quantity lists, and written scope registers. Professional advisory work and commercial sign-off remain with your team or appointed cost consultant, including:

CIM Build is priced per project, with the project price determined by the number of pages we process for that project. Contact our team for a quote on your project.

How CIM Build supports preconstruction quantity review

Manual first-pass trade quantity list assembly on complex commercial bids can take weeks. CIM Build delivers reviewable trade lists in hours, depending on pack size, scope, and document quality.

Cost estimators probe measured and model-derived lines to 2D sheets, 3D elements where present, and measurement bases, while written scope items trace to cited clauses. Separate measured, adjusted, and net totals export to Excel, CSV, or PDF alongside generated IFC models, so reviewers verify working directly.

Teams also trigger report compliance and specification-to-drawing audits to flag unpriced scope with source-cited RFI drafts, and use revision tracking to rerun changed lines while formal cost-consulting sign-off stays with your team.

Frequently asked questions

Does CIM Build provide an independent cost consultant, lender review, or certified estimate?

No. CIM Build is an AI-first service delivered through interactive software. Its preconstruction modules produce first-pass measurement, trade quantity lists, and scope checks. CIM Build does not provide professional cost consulting, bank draw reviews, tax studies, or contract administration.

How does CIM Build work alongside an internal estimating team or outside cost consultant?

Builders that buy outside quantity lists can use our team-led comparison walkthrough to inspect how CIM Build measures the same bid set, or generate structured first-pass lists in-house on bids and smaller jobs while keeping cost consultants focused on pricing advice and formal reporting.

How are measured quantities, adjustments, and net totals tracked?

CIM Build stores the original measured quantity, your team's adjustment, and the net total as separate figures alongside a per-line change record showing who adjusted each line and when. Rows you add manually stay untouched when you generate again.

How does internal revision comparison differ from comparing an existing outside list?

Inside CIM Build, you can save a revision at any milestone and compare two saved internal revisions to review added, removed, and changed lines. Comparing CIM Build against an existing quantity list or estimate you already hold is a team-led walkthrough requested through the contact form.

How do exported trade lists fit our internal estimate structure?

CIM Build exports structured trade sections with measured quantities, separate adjustments, net totals, unit rates, factors, notes, and a trade summary to Excel, CSV, or PDF so your team can map them directly into your internal estimate template or work-breakdown structure.

What formats export from the trade list?

Reviewed lists export to Excel, CSV, or PDF. You can upload and open consultant IFC models in your workspace and download the generated 3D model as IFC. There is no native two-way CostX or Cubit link.

How is CIM Build priced?

CIM Build is priced per project, and the project price is determined by the number of pages we process for that project. Share your project details through the contact form for a quote.

Compare CIM Build against a quantity list you hold

Your first live bid project comes at a discount. Share a live or completed bid set that already has an existing quantity list or estimate, or start without one. Our team scopes the review with you, runs the pack, and walks your estimator through the outputs and differences using reviewed exports and 2D/3D source links. Get results in hours inside interactive software where your team can interact with, trace, and verify every measured line. Timing depends on pack size, document quality, and review scope.

Book a demo

Leave your contact details first and mention any existing quantity list or estimate in the optional notes. Our team will follow up to confirm scope, arrange safe document sharing, and schedule the walkthrough.


Published by CIM Build. This is the text of https://www.cim.build/us/services/quantity-surveying without the site design. Index of all pages. Contact.