Can AI count fixtures, joinery, doors and FF&E off the drawings?
Yes for anything drawn as a symbol, tagged or listed in a schedule. Doors and fixtures count well. Joinery and FF&E depend on how the set documents them. How each one is counted, where counts go wrong, and how to check an AI count before it's priced.
TL;DR: Yes, for items the drawings show as a symbol or a tag, or list in a schedule. Doors and plumbing fixtures count well because they're drawn the same way on every sheet. Joinery and FF&E count well when they're tagged or scheduled, and poorly when they only exist as a line in the brief. Whatever does the counting, check the count against a markup on the sheet before it goes into the price.
What makes an item countable?
An estimator on a mid-size tender can spend days tracing walls and counting symbols in a PDF markup tool before any pricing starts. Counting is the dullest part of that, and the easiest to get wrong late in the day.
Software counts an item when the drawings give it something to find. There are 3 things it can find.
- A symbol drawn the same way each time - a toilet pan, a basin, a floor waste.
- A tag - D2.14 on a door, J-03 on a joinery unit.
- A line in a schedule - the door schedule, the sanitary fixture schedule, the FF&E schedule.
The more of those an item has, the better the count. An item with none of them can't be counted off the drawings by anyone.
Why are doors the easy case?
Doors have all 3.
Every door has a swing on the plan, a tag next to it and a line in the door schedule. So you can count them 2 ways and compare. Doors on the plans with no line in the schedule, and lines in the schedule with no door behind them.
That second check is worth more than the count. A door on the plans with no schedule line has no hardware, no fire rating and no price, until the subcontractor finds it on site.
In CIM Build, Schedule Creator locates every door and window on the plans and reconciles them to the schedule both ways. Where no schedule exists, it builds one from the drawings. There's more on reading one in what a door schedule is, and on the hardware side in door hardware takeoff.
How well do fixtures count?
Well, when the symbols are consistent.
Sanitary fixtures, floor wastes, light fittings and penetrations are symbols repeated across the set. You ask for the count by type and by level, and check it against the fixture schedule if there is one.
Watch for 2 things. The same fixture can appear on the architectural plan and the hydraulic plan, and a count across both sets doubles it. And a typical floor plan drawn once for levels 2 to 5 needs multiplying by 4.
CIM Build's AI takeoff takes the request in plain English - counts of doors, fixtures or penetrations are the examples on the feature page - and works out which sheets to read. The result comes back as a table and a marked-up drawing.
What about joinery?
Joinery depends on how the architect documented it.
On a well-documented set each unit has a tag on the plan and a detail on a joinery sheet. Then it's a count by tag. Say the made-up job is 84 apartments across 6 apartment types. You count kitchens, vanities and robes per type, then multiply by the number of each type. The check is that the types add up to 84.
On a thin set, joinery is a dashed outline on the plan and a note saying refer to interior design. Then there's nothing to count yet. That's a scope gap to raise as an RFI or qualify, and guessing a number hides it.
Joinery is also where the unit matters. A kitchen can be priced per unit, a robe per linear metre and a stone benchtop by area. If your bill follows a standard method of measurement, that method decides the unit. In Australia that's the Australian and New Zealand Standard Method of Measurement, available from the AIQS.
CIM Build's feature pages don't list joinery by name, so I won't claim it here. Bring a set with joinery sheets to a briefing and ask for the count.
And FF&E?
FF&E often isn't on the drawings at all.
Loose furniture, appliances, whitegoods and equipment tend to sit in the brief or in an FF&E schedule. The plans might show a fridge space and nothing more.
So the first FF&E question is about scope. What does the brief require, and do the drawings and schedules show it? On design and construct you deliver every clause of the Principal Project Requirements whether or not the consultants drew it. CIM Build's PPR vs the drawings check runs each clause of the brief against the drawings and the specification, and the PPR's FF&E clauses are part of that.
Once there's a schedule, counting is reading the schedule and reconciling it to the plans, the same as doors.
How do I check an AI count?
The same way you'd check a junior's.
- Open the markup. Every counted item should be marked on the sheet.
- Pick 1 level and count 1 item type by hand.
- Check typical floors were multiplied, and by the right number.
- Check the same item wasn't counted on 2 disciplines' sheets.
- Reconcile the count to the schedule, and chase every difference.
- Re-run it when the next revision lands.
Spend the checking time on the counts that carry the most money. On an apartment job that's usually doors, kitchens and bathrooms. The full method is in how to check a quantity takeoff.
Counts then go where the other quantities go. In CIM Build each line of the bill of quantities sits under the scope item it measures, as m, m², m³ or a count, cited to the drawing or clause it came from.
Book a briefing and bring the tender.
Frequently asked questions
Can AI count doors by fire rating or type? Yes, when the rating or type is on the schedule or the tag. CIM Build's AI takeoff lists doors by fire rating as one of the quantities you can ask for in plain English, and returns a table with a marked-up sheet so the estimator can check it.
Why does an AI count differ from the schedule? Usually because the drawings and the schedule disagree. A door was added on the plan and never scheduled, or a schedule line was left behind after a layout change. Treat each difference as a finding to resolve before pricing.
Can AI count joinery if there's no joinery schedule? It can count joinery that's tagged or drawn consistently on the plans. If the set only shows an outline and a note referring to another document, there's nothing reliable to count, and the right move is an RFI or a qualification.
Is a count enough to price FF&E? No. You also need to know who supplies each item and what the brief specifies. Check the PPR and the FF&E schedule against the drawings first, then count.