Does AI drawing review work on early-stage or incomplete documentation?
AI drawing review works on a 60% set, and that's when a finding is cheapest to fix. What comes back on incomplete drawings, how to triage it, which checks to run early and what a clean result does and doesn't tell you.
TL;DR: Yes. AI drawing review reads whatever documents exist against each other, so it works on a 60% set the same way it works on a finished one. Early is also when a finding is cheapest, because the consultant can still fix it for free. What changes is the mix - more of the findings are things that haven't been drawn yet, so your team triages them as open questions and the check runs again on every issue until they close.
Here's a made-up tender, but you'll know it.
Design development drawings at about 60%. A spec that's still half template, with TBC through the finishes section. The acoustic report is a draft, there's no door schedule yet, and you've got 4 weeks to put a price on it.
Somebody on the team always asks if it's worth reviewing a set everyone knows isn't finished.
It is. That's the set you're signing a price against.
Does it work on a set that isn't finished?
Yes. The review reads the drawings, the specification, the consultant reports and the Principal Project Requirements (PPR) against each other, and flags where they disagree or where a requirement in one has no answer in another. All it needs is 2 documents that are meant to agree.
And on design-and-construct the gaps are yours. You deliver every PPR clause whether or not the consultants drew it.
What comes back on a half-finished set?
3 kinds of finding, and they need different handling.
- 2 documents disagree. The acoustic report calls for Rw+Ctr 50 and the wall's drawn at Rw+Ctr 45. That's a conflict at any stage, and it goes to the consultant now.
- A requirement with nothing drawn against it. The PPR asks for something and no sheet shows it. On a 60% set it could be coming in the next issue. It could also be forgotten.
- A document that isn't there. No door schedule, or the fire engineering report hasn't been issued. Nothing can be checked against a document that doesn't exist, so that part of the review is open until it arrives.
The second kind is the one to watch early. You can't tell from the set whether the consultant's getting to it or has missed it, so ask. We've written more on telling these apart in missing information or a design discrepancy.
In CIM Build every finding cites the sheet, the clause and the document it came from, so whoever's reviewing it can open the source and confirm it in seconds.
Won't it flag a lot of things that just aren't drawn yet?
More than on a finished set, yes. An early set has more gaps and the review reports what it finds.
So triage. CIM Build findings get marked as reviewed, needs action or future RFI. Future RFI is the useful one at this stage - you park the question, and if the next issue doesn't answer it, it's ready to go out.
The list is worth having even when half of it is "not drawn yet". Whatever's still open at tender close becomes a qualification or an allowance, and that's the estimator's call. Either way it's on paper, with the sheet and clause to point to later.
Which checks are worth running early?
Run the ones where the source document already exists.
- The PPR. The brief is usually the most finished document in an early set. PPR vs the drawings checks each clause against the drawings and the specification. Requirements the design missed come back as findings, and so does design that runs past what the brief asks for.
- Consultant reports. Geotech, acoustic and fire reports often land before the drawings catch up with them. Report compliance reads each one against the set, even at draft - you just run it again when the final's issued.
- The code. BCA assessment reads the architectural set against the provisions of the NCC that apply to the building's class and construction type. A problem in the plan is a lot cheaper to fix while the plan can still move. Your certifier still signs off.
- Your own checks. Lessons learnt runs a defect from the last job or a standard detail your team insists on against every new set.
- Schedules. Where no door schedule exists, Schedule Creator builds one from the drawings.
Be more careful with quantities. Early sheets are often undimensioned or marked not to scale, and a sheet marked not to scale can't be measured reliably by anyone. AI takeoff calibrates each sheet's scale against the dimensions printed on it before it measures. Treat anything measured off a 60% set as provisional and measure again when the set firms up.
What happens when the next issue lands?
You run it again.
The PPR audit re-runs on the tender pack and on every design issue after it, so a clause satisfied at tender is checked again at IFC. Things get designed out between issues as well as designed in.
Revision tracking compares each new revision against the last one sheet by sheet, including the changes nobody clouded. And an item raised at tender stays live in the register to handover.
So the question you parked at 60% either closes on the next issue or it's still sitting there, and you know which.
What can't it tell you on an incomplete set?
It can't check a requirement against a document nobody's issued. It can't tell you what the architect meant to draw.
And a clean result on a 60% set only covers the 60%. It means the documents in the review agree with each other today. Keep a note of which reports and which drawing issue went into each run, so nobody reads a clean result as covering more than it did.
Where to start
Take the earliest set you've got on a live job, plus the brief and whatever reports exist, and book a briefing. We'll run it and walk you through what comes back, cited to your own sheets.
CIM Build is used by builders including AW Edwards, Reform Projects, Hurst Concepts and Lee & Co Constructions.
Frequently asked questions
How early can we start using AI drawing review? As soon as there are 2 documents that are meant to agree - a brief and a set of drawings is enough. On a job with early contractor involvement (ECI), that's the first design issue. More on stages in AI drawing review on smaller projects.
Does it need a finished specification? No. It checks the spec sections that exist against the drawings and reports. A section that's still TBC is an open item for your team to chase, and the check runs again when it's issued.
Can we price from a takeoff off early drawings? Only as a provisional number. If the sheets are to scale and dimensioned they'll measure, and every measurement comes back marked up so the estimator can check it. Measure again on the tender set before the price goes in.