Quantity surveying services alternative for measurement and trade scopes
CIM Build is an AI-first service that turns 2D tender packs into measured bills of quantities and written scope checks in hours through interactive software. Inspect visible workings, marked-up 2D sheets, and linked 3D elements where drawn without repeating the whole takeoff while keeping qualified QS judgement with your team. Your first live tender project comes at a discount.
Book a demoCompare CIM Build against a bill you already hold
| Item | Unit | Qty | Source |
|---|---|---|---|
| W1 partition, full height | m² | 579.4 | A-1103 · Spec 09 21 |
| W3 acoustic partition, Rw 45 | m² | 232.7 | A-1103 · Acoustic rpt §4 |
| Bulkhead, 13 mm on suspended grid | m | 48.0 | A-3201 |
| Access panels, 600 × 600 | no. | 12 | RCP L3 |
| Shaft wall to riser R2 | m² | Not measured | Spec 09 21 §3.4 |
Trade
Plasterboard and partitions
Scope items
- Measured 17
- No quantity yet 1
One trade's bill, each line under its scope item with the unit, the quantity and the source.
Trace a measured BOQ line back to the drawing and 3D model
Open a measured line in the bill of quantities to check the element behind the figure. Select the partition, bedroom, or ensuite below to verify the same item on the 2D plan and in 3D. Click any surrounding element in the model to outline it on the 2D plan and inspect its type, dimensions, and source. The 3D view consolidates plans, elevations, details, and schedules, with specification and report requirements linked where available so your team checks scope, quantities, and sources in context.

| Element | Quantity | Source |
|---|---|---|
| W6B bedroom/ensuite partition | 5.02 m² | Ground floor plan & wall schedule |
| Bedroom floor (carpet) | 12.01 m² | Ground floor plan & room boundary |
| Ensuite floor (tile) | 3.63 m² | Ground floor plan & room boundary |
W6B bedroom/ensuite partition 1.598 m plan length × 3.140 m height from storey levels (5.018 m² gross face, one side, before deductions). Wall runs to storey height above the 2.65 m bedroom ceiling and 2.40 m ensuite ceiling. 3D view shows tile on the ensuite face and paint on the bedroom face for visual verification.
Illustrative reconstruction.
Worked example
Internal masonry blockwork
Illustrative reconstruction.
Source and revision
Plan A-101 Rev B
Internal masonry blockwork, Ground Floor plant room, 86 m² measured from Plan A-101 Rev B.
What you send and what comes back
CIM Build is an AI-first service delivered through interactive software. Through CIM Build's preconstruction modules, your team gets first-pass measurement, bills of quantities, written scope checks, and visible 2D/3D source links from 2D packs. Qualified quantity surveyor judgement, pricing, valuations, and formal certification stay with your commercial team or appointed consultant.
Your first live tender project comes at a discount. Our team agrees the review scope with you, runs your live tender pack, and walks your team through results in hours that you can verify and use. Timing depends on pack size, document quality, and review scope.
Quantity surveyors can understand the whole project together in one 3D view during bill verification. Model geometry comes from disparate plans, elevations, details, and schedules, with specification and consultant report requirements linked where available. Trace each measured item back to its 3D element, linked requirements, quantity, and originating source documents.
| Stage | What happens |
|---|---|
| What you send | 2D drawings, schedules, specifications, Principal Project Requirements (PPR), and consultant reports |
| What comes back | A bill of quantities organised to ANZSMM work sections across lengths, areas, volumes, and counts (m, m², m³, and counts), with in-scope written items carried beside measured lines and a linked 3D model |
| How you check it | Open any measured line on its 2D drawing sheet and 3D elements where drawn, review separate measured, adjustment, and net totals as shown in the worked example above, and inspect the per-line change record |
| Who signs off | Your internal commercial team or qualified quantity surveyor reviews conventions, enters rates, prices risk, and signs off the bill |
How CIM Build compares with an external quantity surveying engagement
Builders of all sizes engage quantity surveyors for tender bills, cost planning, and commercial advice. Separating first-pass measurement from professional advice helps teams check deliverables clearly and bring bills of quantities onto smaller commercial jobs alongside major builds.
| Criterion | Typical external QS engagement | CIM Build |
|---|---|---|
| What you hand over | Issue a brief and tender pack for off-site measurement and reporting | Upload the 2D tender pack into your workspace and run schedules, model, and bill of quantities |
| What you receive | A bill of quantities or cost report prepared to the agreed brief and standard | Measured bill of quantities following ANZSMM work sections, written scope items, 3D model, and Excel, CSV, or PDF exports |
| How working is shown | Confirm whether marked-up drawings, measurement workings, and assumption notes are included in the agreed deliverables | Measured lines link to their 2D drawing sheet and 3D elements where drawn, with measured quantity, adjustment, and net total held separately |
| What happens on a revision | Revision allowances and turnaround vary by practice. Confirm how mid-tender addenda are handled in the agreed brief | Upload revised sheets, see flagged lines, regenerate while keeping earlier adjustments, rates, and notes on retained lines, and compare two saved internal bill revisions |
| Who holds pricing and professional advice | The appointed quantity surveyor provides cost planning, valuations, and contract advice within their consultancy brief | CIM Build measures and structures scope. Qualified QS judgement, pricing, valuations, and certification stay with your team or consultant |
| How it is charged | Confirm the fee basis (fixed fee per stage, percentage of construction value, or hourly rate) and inclusions in the brief | Priced per project, based on the number of pages processed for that project |
How the measurement and bill workflow runs in 3 steps
- Your team sets trades and runs the pack: Upload your 2D drawings, schedules, specifications, PPR, and consultant reports, select project trades, run schedules and the 3D model, and generate the bill of quantities.
- CIM Build measures and structures trade sections: CIM Build measures located model elements into ANZSMM work sections and carries in-scope written requirements from your Scope of works register under each trade.
- Your commercial team inspects, adjusts, and exports: Review every measured line in 2D and 3D, record separate adjustments, rates, factors, and notes with a per-line audit record, save and compare internal bill revisions, and export to Excel, CSV, or PDF.
Manual measurement and bill assembly on complex commercial tenders can take weeks. CIM Build delivers first-pass results in hours, depending on pack size, document quality, and review scope. For guidance on how external QS briefs and fee structures are set in Australia, see our quantity surveyor cost guide and the AIQS resources overview.
For full tender pricing preparation and quote levelling, see construction estimating. For drawing-level sheet measurement, see quantity takeoff. To explore the product workflows in detail, read bill of quantities software and scope of works.
What stays with your quantity surveyor or commercial team
CIM Build produces traceable first-pass measurement, bills of quantities, and written scope registers. Professional consultancy and commercial sign-off remain with your team or appointed quantity surveyor, including:
- Certified or standard-compliant bills of quantities and ANZSMM compliance sign-off
- Cost planning, market pricing, preliminaries, and risk allowances
- Progress claim valuations, variation assessments, and contract administration
- Financier or bank cost reports, tax depreciation schedules, and expert or dispute advice
CIM Build is priced per project, with the project price determined by the number of pages we process for that project. Contact our team for a quote on your project.
How CIM Build supports commercial bill review
Manual first-pass bill of quantities assembly on complex commercial tenders can take weeks. CIM Build delivers reviewable bills of quantities in hours, depending on pack size, scope, and document quality.
Quantity surveyors probe measured and model-derived lines to 2D sheets, 3D elements where present, and measurement bases, while written scope items trace to cited clauses. Separate measured, adjusted, and net totals export to Excel, CSV, or PDF alongside generated IFC models, so reviewers verify working directly.
Teams also trigger report compliance and PPR-to-drawing audits to flag unpriced scope with source-cited RFI drafts, and use revision tracking to rerun changed lines while formal QS sign-off stays with your team.
Frequently asked questions
Does CIM Build provide a chartered quantity surveyor, valuations, or certified bills?
No. CIM Build is an AI-first service delivered through interactive software. Its preconstruction modules produce first-pass measurement, bills of quantities, and scope checks. CIM Build does not provide professional QS consultancy, cost certification, bank valuations, tax depreciation schedules, or contract administration.
How does CIM Build work alongside an appointed external quantity surveyor?
Builders that commission external QS bills can use our team-led comparison walkthrough to check how CIM Build measures the same tender pack, or generate structured first-pass bills in-house on tenders and smaller jobs while retaining their appointed QS for cost planning, valuations, and formal sign-off.
How are measured quantities, adjustments, and net totals tracked?
CIM Build stores the original measured quantity, your team's adjustment, and the net total as separate figures alongside a per-line change record showing who adjusted each line and when. Rows you add manually stay untouched when you generate again.
How does internal revision comparison differ from comparing an external QS bill?
Inside CIM Build, you can save a bill revision at any milestone and compare two saved internal revisions to review added, removed, and changed lines. Comparing CIM Build against an external QS bill you already hold is a team-led walkthrough requested through the contact form.
Does CIM Build follow ANZSMM work sections?
Generated trade sections in Australia follow ANZSMM work sections to support estimator and quantity surveyor review. Responsibility for measurement conventions, contractual precedence, and ANZSMM sign-off stays with your commercial team.
What formats export from the bill of quantities?
Reviewed bills export to Excel, CSV, or PDF with measured quantities, separate adjustments, net totals, rates, factors, notes, and a trade summary. You can upload and open consultant IFC models in your workspace and download the generated 3D model as IFC. There is no native two-way CostX or Cubit link.
How is CIM Build priced?
CIM Build is priced per project, and the project price is determined by the number of pages we process for that project. Share your project details through the contact form for a quote.
Compare CIM Build against a bill you already hold
Your first live tender project comes at a discount. Share a live or completed tender set that already has a QS bill or internal quantity list, or start without one. Our team scopes the review with you, runs the pack, and walks your estimator through the outputs and differences using reviewed exports and 2D/3D source links. Get results in hours inside interactive software where your team can interact with, trace, and verify every measured line. Timing depends on pack size, document quality, and review scope.
Book a demoLeave your contact details first and mention any existing bill in the optional notes. Our team will follow up to confirm scope, arrange safe document sharing, and book the walkthrough.