What is a fire engineering report, and what does the builder need from it?

A fire engineering report documents a building's fire safety Performance Solutions under the NCC and lists the conditions they depend on. Here's what's in one, how it's produced, and the 6 things a builder should pull out of it before pricing.

TL;DR: A fire engineering report (FER) is the document a fire safety engineer writes to show that a building's fire safety Performance Solutions meet the Performance Requirements of the National Construction Code (NCC). Under NCC clause A2G2 it's the final report of the Performance Solution process, and it lists the conditions and limitations the solutions depend on. The builder needs the current revision, the full list of conditions, and each condition shown on the drawings, schedules and specification being priced.

The report is 90 pages. The sentence that changes your door package is on page 61, in a paragraph of prose.

Most of an FER is analysis written for the certifier. A small part of it is scope, and that part is the builder's problem.

What is a fire engineering report?

It's the write-up of the fire safety design where the building departs from the code's standard provisions.

The NCC gives 2 ways to meet its Performance Requirements. A Deemed-to-Satisfy (DTS) Solution follows the provisions in the code. A Performance Solution is a design-specific answer that has to be assessed and documented. We set out the difference in deemed-to-satisfy vs performance solution.

When the Performance Solution is about fire, the person doing the assessment is a fire safety engineer. The NCC glossary defines fire safety engineering as the application of engineering principles, rules and expert judgement, based on a scientific appreciation of fire, its effects and how people react and behave.

"Fire engineering report" is the industry's name for the result. You'll also see it called a fire safety engineering report or a performance solution report.

Why does a building have one?

Because some part of the design doesn't follow the DTS fire provisions, and someone has to show it still meets the Performance Requirements.

The ABCB says Performance Solutions are commonly used for innovative designs, unique buildings or situations where no DTS Provision exists.

A made-up example. Say an 84-apartment building has a corridor where the path of travel to an exit is longer than the DTS Provisions allow. The fire engineer assesses that floor plate with the building's other fire safety measures and shows the Performance Requirements are still met. The longer corridor stays, and the measures the analysis relied on become conditions.

How is it produced?

Clause A2G2(4) of NCC Volume One, Part A2 sets 4 steps.

  1. A performance-based design brief (PBDB) is prepared with the relevant stakeholders. It agrees the scope, the acceptance criteria and the Assessment Methods before the analysis starts.
  2. The engineer carries out the analysis the brief set out.
  3. The results are evaluated against the acceptance criteria.
  4. A final report is prepared.

The FER is step 4. The ABCB also publishes the Australian Fire Engineering Guidelines, which give fire engineers guidance on analysis and evaluation strategies.

What's in a fire engineering report?

The ABCB's guide to the process says the final report should record:

The last line is the one to read twice. The conditions are things like fire resistance levels, detection and warning coverage, sprinkler arrangements and smoke control. We listed the common ones in how to check a fire engineering report against the drawings.

What does the builder need from it?

6 things.

  1. The current revision, and what it was written against. An FER names the drawings it assessed. If the set you're pricing is 2 revisions later, the report may be describing a building that has changed.
  2. The list of departures. Which DTS Provisions each Performance Solution replaces, by clause. Without it you can't tell a design error from a deliberate departure when a drawing doesn't match the code.
  3. Every condition as its own line. Including the ones written in prose. Each line needs the FER section number next to it.
  4. Where each condition lands. A door rating belongs in the door schedule. Detection belongs on the electrical or fire services layouts. A condition with no home in the documents is in nobody's price, and it gets built at your cost.
  5. The assumptions about use. The analysis was done for a stated use, layout and set of fire safety measures. A product substitution or a moved wall goes back to the fire engineer before it's built.
  6. The owner's obligations. Management and maintenance conditions go into the handover documents, so collect them from day 1.

Whether closing a gap in the report is the builder's job depends on the contract. On design and construct it often is. Read the design obligations and get advice on them.

Who approves it?

The fire engineer doesn't approve their own report.

The NCC leaves the decision with the appropriate authority - the relevant authority with the statutory responsibility to determine the matter. The ABCB's roles and responsibilities page has certifiers reviewing plans and inspecting work to confirm whether it meets the regulatory requirements, and it's plain that the ABCB doesn't assess individual designs.

So the certifier or building surveyor approves on the strength of the report, and then expects the building to match it.

Where CIM Build fits

Report compliance reads every consultant report - geotech, acoustic, ESD, fire, traffic, waste - against the drawing set and the specification, and returns each finding cited to the clause and the sheet. Findings triage to reviewed, needs action or future RFI.

BCA assessment reads the architectural set against the code provisions for the building's class and construction type. Where the drawings follow the FER and depart from a DTS clause, the team triages that finding against the report.

Book a briefing and bring the FER and the set.

Frequently asked questions

Does every building need a fire engineering report? A building whose fire safety design follows the Deemed-to-Satisfy Provisions throughout doesn't go through the Performance Solution process in clause A2G2. The report exists where one or more fire safety Performance Solutions are used.

Is the fire engineering report the same as the performance-based design brief? They're 2 separate documents. The brief is step 1 of the process and agrees how compliance will be shown. The report is step 4 and records what the analysis found and the conditions that come with it.

What happens if the drawings don't match the fire engineering report? The Performance Solution was assessed for the design in the report. Raise an RFI citing the FER section and the sheet, and let the fire engineer and the design team resolve it before the work is built.

Can AI read a fire engineering report? Software can pull the requirements out of the report and check each one against the drawings and schedules, with the clause and the sheet cited. Whether the fire engineering itself is sound stays with the fire engineer and the certifier. More in can AI check drawings against the NCC.


Published by CIM Build. This is the text of https://www.cim.build/uk/blog/what-is-a-fire-engineering-report without the site design. Index of all pages. Contact.