NRM2 bill of quantities guide for US commercial teams

Guide for US commercial teams reviewing UK or international bids under RICS NRM2, how NRM2 differs from CSI MasterFormat, and what to check before pricing.

NRM2, titled Detailed measurement for building works by the Royal Institution of Chartered Surveyors (RICS), sets out rules for measuring and structuring bills of quantities on UK and international building projects. US commercial builders, general contractors, and estimators encounter NRM2 when pricing UK or cross-border bids whose contract documents specify RICS measurement rules.

What RICS NRM2 covers on UK and international bids

NRM2 is the detailed measurement volume of the RICS New Rules of Measurement (NRM) suite, used to prepare bills of quantities and quantified schedules of work for building projects.

RICS published the current NRM2 2nd edition content in October 2021 and reissued it in October 2022 as practice information without material changes.

NRM2 applies only when the bid documents or contract specify it as the governing measurement basis. It is a UK measurement framework with no domestic requirement on US commercial bids. When a US team receives a cross-border bid package, confirming the exact measurement standard, edition, and any project-specific amendments stated in the preliminaries is the first commercial check before pricing starts.

How NRM2 differs from CSI MasterFormat

US estimating teams are used to organizing project manuals, specifications, and detailed cost information under CSI MasterFormat, which classifies numbers and titles by work results across North America.

MasterFormat and NRM2 serve different roles and are not equivalent systems:

Keep NRM2 conventions in their original UK and metric context when reviewing an NRM2 bid. Translating RICS measurement rules into imperial feet or mapping them directly onto MasterFormat divisions can distort item coverage and create pricing errors at trade boundaries. For a foundational overview of how commercial bills work on US projects, read what is a bill of quantities.

NRM2 bid review checklist for US commercial teams

Receiving a client bill prepared under NRM2 does not remove the need for commercial verification. Drawings revise through addenda, consultant reports add obligations outside measured lines, and descriptions can omit key specification details. Run these 6 checks before pricing or issuing trade inquiries:

Review areaWhat to check before pricingCommercial action if a gap appears
Project measurement basis and editionConfirm whether the contract specifies NRM2, which edition applies, and whether project-specific amendments override standard rules.Record the governing basis in the bid review log and issue a clarification if preliminaries conflict.
Complete item descriptionsCheck that major line items state the material, performance rating, backing or fixing context, and location needed for accurate trade pricing.Cross-check against the technical specification and issue a pre-bid RFI where descriptions are incomplete.
Consistent measurement unitsVerify that units match NRM2 conventions and stay consistent within each work section before extending rates.Query inconsistent or lump-sum entries that hide measurable trade quantities.
Drawing and addendum revisionsCompare the issue date and drawing register used to prepare the bill against the latest bid drawings and addenda.Isolate lines tied to superseded sheets and re-measure affected areas before locking rates.
Unmeasured and provisional itemsIdentify provisional sums, approximate quantities, and obligations from Employer's Requirements, fire strategies, or acoustic reports that lack firm quantities.Keep unmeasured rows visible for commercial allowances, qualifications, or written clarifications.
Qualified QS and estimator reviewConfirm that a quantity surveyor or senior estimator familiar with UK contract rules reviews high-value sections, risk allocation, and exclusions before submission.Escalate ambiguous scope boundaries or contractual precedence questions before bid sign-off.

Reviewing cross-border 2D bid packages in CIM Build

When US commercial teams price a UK or international bid under NRM2 and need an independent first-pass quantity check from 2D drawings, CIM Build's preconstruction modules operate as an AI-first service that delivers results in hours through interactive software with visible workings and verifiable measurements, depending on pack size, document quality, and review scope.

Estimators inspect measured quantities alongside marked-up 2D sheets and linked 3D elements where drawn without repeating the whole takeoff themselves, while source review and estimator judgment remain with your team.

In CIM Build's bill of quantities and AI takeoff workflow, your team uploads the 2D set, sets project trades, runs schedules so CIM Build extracts schedules, locates marks on the drawings, and builds a 3D model, and then generates a bill of quantities alongside scope items your team marked in scope of work.

Estimators inspect measured lines in 3D and on their source sheets, keep adjustments, rates, and notes separate from measured quantities across drawing revisions, and export to Excel, CSV, or PDF plus IFC for the 3D model. Separately, teams run reviews across owner requirements and specifications and consultant reports so CIM Build extracts obligations and checks them against drawings, then raise drafted RFIs in suggested RFIs.

CIM Build supports commercial review by generating draft quantities and cited document findings for your team to inspect. CIM Build does not claim RICS endorsement, native NRM2 classification, or formal NRM2 compliance certification, and your quantity surveyor or senior estimator retains responsibility for measurement conventions, contractual precedence, and final bid sign-off.

Frequently asked questions

What is the difference between NRM1, NRM2, and NRM3?

RICS publishes NRM as a 3-volume suite covering building cost management across a project's life cycle. NRM1 covers order of cost estimating and cost planning, NRM2 covers detailed measurement for building works used in bills of quantities, and NRM3 covers building maintenance cost planning.

Do US domestic commercial projects require NRM2?

No. NRM2 is a UK measurement framework published by RICS. US commercial builders only need to follow NRM2 when bidding UK or international projects whose contract documents explicitly specify it.

Is CSI MasterFormat the US equivalent of NRM2?

No. CSI MasterFormat classifies numbers and titles by work results to organize project manuals, specifications, and cost information in North America. It is a classification system, while NRM2 sets detailed measurement rules for bills of quantities.

Does CIM Build certify NRM2 compliance?

No. After your team starts each step, CIM Build generates draft trade quantities and an explorable 3D model from your schedules and drawings, and separately runs document reviews to produce cited requirement findings. It does not claim RICS endorsement, native NRM2 classification, or formal NRM2 compliance certification.

How is CIM Build priced for bill of quantities preparation and document review?

CIM Build is priced per project, and the project price is determined by the number of pages we process for that project. Contact CIM Build for a quote on your project.


Next step: Explore our bill of quantities software, or contact CIM Build with a live bid set or representative package to test the workflow.

Send us a live bid set and see what it finds

Your first live bid project comes at a discount. We scope the review with you, run your drawings, schedules, and specifications, and walk through the evidence with your team. Get results in hours inside interactive software where your team can trace sources and verify every measurement and finding. Timing depends on pack size, document quality, and review scope.