Can AI assess performance solutions or only deemed-to-satisfy provisions?
An AI code check reads drawings against the Deemed-to-Satisfy Provisions and flags where the design departs from them. Whether a Performance Solution meets the NCC is for the engineer and the appropriate authority. AI can still check the drawings carry every condition the solution relies on.
TL;DR: An AI code check works against the Deemed-to-Satisfy Provisions. It reads the drawings against the clauses that apply and flags where the design departs from them. It doesn't decide whether a Performance Solution meets the Performance Requirements - the NCC puts that through set Assessment Methods, and the engineer and the appropriate authority make the call. What AI can do with a Performance Solution is check the drawings carry every condition the report relies on.
The fire engineer's report says the travel distance on level 3 is fine at 26 m because the floor is sprinklered and the corridor is smoke-separated. The architect's plan shows 26 m. The code check flags it as over the Deemed-to-Satisfy limit.
Both are right. They're answering 2 different questions.
What are the 2 pathways under the NCC?
A Deemed-to-Satisfy Solution, a Performance Solution, or a mix of both.
Clause A2G1 of NCC 2025 Volume One says the Performance Requirements can be met by any of those 3 routes. Under A2G3, a design that follows the Deemed-to-Satisfy Provisions is treated as meeting the Performance Requirements.
A Performance Solution takes more work. A2G2 says it has to be shown to comply through 1 or more Assessment Methods - evidence of suitability, a Verification Method, Expert Judgement, or comparison with the Deemed-to-Satisfy Provisions.
There's a longer explanation in Deemed-to-Satisfy vs Performance Solution.
What can AI check on the Deemed-to-Satisfy side?
Whether the drawings match the provisions that apply to this building.
The Deemed-to-Satisfy Provisions are written as things you can measure or read off a sheet - a width, a distance, a fire rating, a ceiling height. So a code check starts from the building's class and construction type, works out which clauses apply, and reads every sheet against them.
Each finding should carry the clause, the sheet and the revision, so a person can confirm it at the source. We covered how far to rely on that in can AI check drawings against the NCC.
What happens when the design uses a Performance Solution?
The check flags the departure, and a person matches it to the report.
A drawing doesn't say which pathway it's on. So where the fire engineer has extended a travel distance, the Deemed-to-Satisfy check reports it as over the limit. That's a correct finding. It tells you this part of the design depends on a Performance Solution.
The triage step is to check there's a report behind it. If the fire engineering report covers that travel distance, mark the finding reviewed and note the report section. If no report covers it, you've found a departure nobody has justified, and that needs an RFI before the price goes in.
Here's a made-up example on an 84-apartment job. The check returns 31 findings against Volume One. 6 line up with the 6 Performance Solutions in the fire engineering report. The other 25 have nothing behind them, and those are the ones to chase.
Can AI decide whether a Performance Solution complies?
No. The NCC sets out who does that and how.
A2G2 requires a performance-based design brief prepared in consultation with relevant stakeholders, then the analysis the brief proposes, an evaluation against the brief's acceptance criteria, and a final report. Expert Judgement and Verification Methods are named Assessment Methods. That's modelling, engineering judgement and agreement between the parties.
Software reading the drawings isn't part of that process. The engineer does the assessment, and the certifier or building surveyor accepts it or doesn't.
If a tool says it has assessed a Performance Solution as compliant, ask which Assessment Method it used and who signed the report.
What can AI check about a Performance Solution?
That the drawings deliver what the report assumed.
Under A2G2, the final report has to state any conditions or limitations. Those conditions are where the money is. The 26 m travel distance works because of the sprinklers, the smoke separation and a self-closing door at the end of the corridor.
If the door schedule shows that door without a closer, the Performance Solution on paper and the building on the drawings have come apart. Nobody priced the closer. It turns up at the certifier's inspection, a few weeks before practical completion, and the builder fits it at its own cost.
That's a document check - report against drawings, requirement by requirement. AI does that well, because it reads every condition against every sheet on every reissue. We've written up the manual method in how to check a fire engineering report against the drawings.
A2G4 adds 1 more thing to watch. Where a Performance Solution is combined with Deemed-to-Satisfy Provisions, the related Deemed-to-Satisfy Provisions and the other Performance Requirements the solution affects have to be identified. So a Performance Solution for egress can reach into the door hardware, the services and the fire-stopping, and the check has to follow it there.
How CIM Build handles both
BCA assessment assesses the architectural set against the provisions that apply to the building's class and construction type, and cites the clause, the sheet and the revision behind every finding. The measurement is drawn where it was taken. The BCA/NCC volumes from 2019 to 2025 and the Red Book are preloaded, so the team can query them directly against the job.
Report compliance reads the fire engineering report, and the other consultant reports, against the drawing set and the specification. A fire door scheduled at a lower fire rating than the fire engineering report requires comes back as a finding cited to both documents.
The team triages each finding as reviewed, needs action or RFI, and nothing goes to a consultant until a person sends it.
Book a briefing and bring the set and the fire engineering report.
Frequently asked questions
Does an AI code check understand Performance Solutions? It checks the drawings against the Deemed-to-Satisfy Provisions, so a Performance Solution shows up as a departure. A person matches each departure to the engineer's report. Whether the solution meets the Performance Requirements is assessed under clause A2G2 of the NCC by the engineer and accepted by the appropriate authority.
Is a finding against a Deemed-to-Satisfy clause a non-compliance? Only if there's no Performance Solution behind it. The NCC allows a Deemed-to-Satisfy Solution, a Performance Solution or a combination under clause A2G1. A flagged departure with a report covering it is a design choice. One with no report is a question for the consultant.
Who approves a Performance Solution? The certifier or building surveyor, as the appropriate authority, on the strength of the engineer's report. State legislation sets out who that is and what they need to see, so check with the certifier on your job.