← Back to blog
5 min read

Can AI write a scope of works for each trade from the drawings and spec, in our own template?

AI can write a scope of works for each trade from the drawings and specification, with the sheet and clause behind every line. What goes into an AI scope of works, what CIM Build supports for your own trade scope template, and how the scope gets matched against subcontractor quotes.

TL;DR: Yes - AI can write a scope of works for each trade from the drawings and specification, with the sheet or clause behind every line, and export it into your own template. CIM Build reads the drawings and the specification into a scope register for each trade, in the order the work happens, and matches the subcontractor quotes against it. The register exports into the templates your contract admin already uses, and CIM Build's workspace opens your Word or Excel trade scope template as it is, beside the drawing set. The estimator checks the scope and decides what goes into each package.

What goes into an AI scope of works?

A scope of works (SOW) for 1 trade says what that subcontractor has to deliver - the work, the materials, the specification it's built to, and where their package stops and the next one starts.

Every line needs a source. The sheet or clause behind a line is what lets the estimator check it in seconds, and it's what you point to when a subcontractor says the work was never in their package.

CIM Build's scope of works puts what the drawings and specification say about each trade into a scope register, in the order the work happens, with the sheet and clause on every line. Every scope item cites where it came from, so the package you send to market can be defended.

What does a scope written by hand miss?

A builder pricing 30 trades reads the set 30 times, once per trade. Nobody has those days in a tender, so the scope of works gets written from memory and the last job's template.

That's how work falls between packages. Here's a made-up one.

The hydraulic drawings show pipes running through a fire-rated wall, and the spec calls for a fire collar at every penetration. The plumber's quote excludes fire collars. The partition installer's quote excludes penetrations. Each quote reads fine on its own, and the collars are in nobody's price.

When that turns up on site there's no variation to claim, because the work was in the documents all along. The builder pays for it.

Can it use our trade scope template?

CIM Build keeps trade scope in a register, and registers export into the templates your contract admin already uses. So the scope leaves CIM Build in the format your team already works in.

If your template is a Word document or an Excel workbook, CIM Build's workspace opens the .docx or .xlsx as it is. A workbook gets a grid that behaves the way Excel does - formula bar, autocomplete, cell references, the fill handle and undo - and either file exports back in the same format.

The file sits in a folder next to the drawing set, so the template carries from job to job. Ask for a change in plain English and it happens in the document, with every AI edit highlighted for a person to accept or reject.

The quickest way to see how your own template comes through is to bring it. Book a briefing with the workbook or document your team writes scopes in, and we'll open it in CIM Build on the call.

How is the scope matched against subcontractor quotes?

When the quotes come back, each one matches against its trade's scope register, and exclusions line up against the scope they exclude. In the made-up example, the plumber's fire collar exclusion would line up against the scope line it leaves uncovered while both packages are still open. Closing the gap then costs nothing.

Tender levelling runs that across every quote in the trade. CIM Build lines the quotes up item by item with the sheet and clause behind each line, flags the allowance only 1 quote carries, and exports the comparison to Excel. The estimator decides how each gap is carried.

On a healthcare tender, CIM Build levelled 6 trades in about 24 hours, where the senior estimator would normally allow 2 weeks. There's a worked example in how to level subcontractor quotes.

Does the scope of works tie to the bill of quantities?

In CIM Build it does. The quantities are measured against each trade's scope to build that trade's bill of quantities, and each line in the bill sits under the scope item it measures. So a scope item with no quantity stands out before the tender closes.

Every line carries its unit, its quantity and the sheet or clause it came from, and the bill exports to Excel. The estimator checks the lines that carry the most cost against the markup before they're priced.

What stops a scope going out with questions still open?

Safeguard holds the export of a trade's scope of works while open RFIs, blocking findings, scope discrepancies or untriaged quote exclusions remain against that trade. Your team chooses which registers the gate watches and which states count, and anything a person has already dismissed stops holding.

CIM Build is used by builders including AW Edwards, Reform Projects, Hurst Concepts and Lee & Co Constructions. Send us a set and a subcontractor quote and we'll show you the scope it leaves uncovered.

Frequently asked questions

Is a scope of works the same as a bill of quantities? A scope of works says what each trade must deliver. A bill of quantities says how much of it there is, line by line, with units. CIM Build builds both from the same documents and keeps each BoQ line under the scope item it measures. More in the best AI bill of quantities software for Australian builders.

Can ChatGPT write a scope of works? ChatGPT and Claude can read the files you upload to a conversation, and they're useful for drafting and for questions about a single document. A scope of works for every trade needs the whole set read together, the sheet and clause cited on every line, and the whole read run again on every revision. That's the work CIM Build does.

What happens to the scope when the drawings are revised? Registers re-run as revisions land, so the history is intact when a variation needs substantiating. Revision tracking compares each new revision against the last one sheet by sheet. Check each change against the earlier and later sheets before you rely on it.


Published by CIM Build. This is the text of https://www.cim.build/au/blog/ai-scope-of-works-by-trade without the site design. Index of all pages. Contact.