What is a Section J report?

A Section J report is the energy efficiency assessment of a Class 2 to 9 building against Section J of NCC Volume One. Here's what Section J covers, what the report contains, the compliance pathways, and what a builder should check before pricing.

TL;DR: A Section J report is the energy efficiency assessment of a Class 2 to 9 building against Section J of National Construction Code (NCC) Volume One. It shows how the design meets the energy Performance Requirements, either through the Deemed-to-Satisfy Provisions in Parts J2 to J9 or through a Verification Method such as a reference building model. For the builder it sets insulation, glazing, sealing, lighting and services requirements that have to show up on the drawings and in the specification.

The glazing supplier offers an alternative at tender. It's cheaper and it looks the same.

Whether you can take it depends on a table in the Section J report that nobody on the tender team has opened.

What is Section J?

Section J is the energy efficiency section of NCC Volume One, the volume for Class 2 to 9 buildings. In NCC 2022 it has 9 parts:

Houses sit in Volume Two, which has its own energy provisions. Which volume covers which building is in NCC volumes explained.

What does a Section J report contain?

"Section J report" is the industry's name for the consultant's assessment against those parts. The NCC doesn't prescribe a format. A typical one covers:

The climate zone drives most of the numbers. The ABCB groups locations into 8 NCC climate zones, and they're the primary classification for setting energy efficiency requirements. The zone is based on the building's location, and the ABCB warns that zones don't follow postcodes or council boundaries.

The fabric section is where most of the builder's scope sits. Part J4 sets minimum Total R-Values for roofs, ceilings and floors by climate zone, limits on roof lights, and maximum Total System U-Values and solar admittance for walls and glazing.

Deemed-to-satisfy or a model?

There are 2 broad pathways, and the report should say which one it used.

Under clause J2D1 of Part J2, a Deemed-to-Satisfy Solution meets Performance Requirements J1P1 to J1P4 by complying with the elemental parts. Each element is checked against its own clause.

The other path is a Performance Solution. Part J1 lists Verification Methods for it, including J1V1 NABERS Energy, J1V2 Green Star, J1V3 verification using a reference building, and J1V4 verification of building envelope sealing.

The pathway changes how much room you have on site.

On the elemental path, each element stands on its own clause. On a reference building model, the result comes from the whole building working together. So a glazing substitution that looks harmless can change the modelled result, and the swap goes back to the consultant who ran the model.

The general difference between the 2 paths is in deemed-to-satisfy vs performance solution.

Who prepares a Section J report?

Usually an ESD or energy efficiency consultant engaged by the developer or the design team. On design and construct the builder often inherits the report at tender and owns keeping it current through design development. Check your contract for who carries that.

The consultant writes the assessment. The certifier or building surveyor decides compliance, as with the rest of the NCC.

Does Section J work the same in every state?

No. NSW is the one to watch.

The ABCB's Part J1 page notes that some of the Performance Requirements for sole-occupancy units don't apply in NSW, where BASIX regulates those matters, and Part J2 carries NSW replacement wording. Every state and territory has a schedule of variations in Volume One.

The edition matters too. NCC 2025 was published on 1 May 2026, and the states adopt it on different dates. The clause references in this article are to NCC 2022, so check the report's edition against the approval before you rely on a number.

What should a builder check before pricing?

5 things.

  1. The edition, the climate zone and the drawing revisions the report assessed. If the facade changed after the report was issued, the report is describing an earlier building.
  2. Every stated value has a home. Say the report gives a Total System U-Value for the glazing and the window schedule lists sizes and types with no performance column. The supplier prices the schedule, and the difference turns up when the certifier asks for evidence.
  3. Insulation in the wall and roof types. The R-value in the report should match the wall type schedule and the specification, including thickness where the cavity is tight.
  4. The services clauses reach the services documents. Lighting, air-conditioning, hot water and metering requirements belong in the electrical, mechanical and hydraulic documents.
  5. The pathway before any substitution. On a modelled job, price the alternative only after the consultant confirms it.

The step-by-step version is in how to check a Section J report against the drawings.

Where CIM Build fits

Report compliance reads each consultant report, the ESD and energy reports included, against the drawing set and the specification and returns each finding cited to the clause and the sheet. Findings triage to reviewed, needs action or future RFI.

BCA assessment reads the architectural set against the code provisions for the building's class and construction type, with the clause, the sheet and the revision behind every finding.

Book a briefing and bring the Section J report and the set.

Frequently asked questions

Does Section J apply to houses? Section J is in Volume One, which covers Class 2 to 9 buildings. Class 1 houses are in Volume Two, with their own energy efficiency provisions.

Does Section J apply to the apartments or only the common areas? Both, by different routes. Clause J2D2 has the sole-occupancy units of a Class 2 building assessed through the Part J3 elemental provisions or house energy rating software, with Parts J6 and J7. The rest of the building goes through Parts J4 to J8. NSW varies this, so check the state schedule.

Does the Section J report need updating when the design changes? If the change touches the envelope, the glazing or the services it assessed, yes. The report's conclusions hold for the design it read, so send the revised drawings back to the consultant.

Who signs off Section J compliance? The certifier or building surveyor for the job, on the consultant's report and the evidence for what was installed.