How does Procore's tender levelling compare with CIM Build?
Procore's tender levelling agent compares subcontractor proposals against the specs and drawings inside Procore. CIM Build reads every quote against a trade scope built from the drawings and specification, with the sheet and clause on every line. What each does, and how to test both.
TL;DR: Procore's tender levelling runs inside Procore's tender management, and its tender levelling agent (the Bid Leveling Agent on Procore's US site) compares subcontractor proposals against the specs and drawings in one matrix and flags buried exclusions and price gaps. CIM Build reads the drawings and specification into a scope register for each trade, then reads every quote against it with the sheet and clause behind each line, and exports the comparison to Excel. CIM Build connects to Procore and the documents stay there, so a builder on Procore can use both.
What is Procore's tender levelling agent?
It's one of the pre-built agents in Procore AI. Procore's Australian site calls it the tender levelling agent, and the US site calls it the Bid Leveling Agent.
Procore says the agent compares subcontractor proposals against the specs and drawings in a standardised matrix, with scope, line items and costs side by side. It surfaces buried exclusions, missing deliverables and cost discrepancies before the contract is awarded. Procore also says it helps cut tender qualification time from weeks to minutes.
The agents page says Procore's agents gather data, cross-reference and draft, and a person makes the final decision.
2 more agents sit close by. The Bid Analyst Agent evaluates subcontractor tenders against the drawings and specs. The scope writer agent pulls tasks, deliverables and requirements out of the documents, drawings and specs to define scope.
Who does Procore's tender levelling suit?
Builders who run their tenders through Procore.
Procore's tender management covers the tender from creating packages to awarding bids. Invitations and automated reminders go out from Procore, subcontractor bids sit side by side, and tenders are levelled for different scopes and pricing.
Then the award. An awarded tender converts into a subcontract or purchase order, and the data flows into Procore Financials.
In the Bidding tool, bid forms break down scope and cost, and bid leveling compares the submitted bids side by side, with an export to CSV.
How does CIM Build level subcontractor quotes?
It starts with the trade scope. CIM Build reads the drawings and the specification into a scope register for each trade, in the order the work happens, with the sheet and clause on every line.
Then the quotes come back. Lump sums, schedules of rates, 2-page letters with the exclusions on the last page.
CIM Build's tender levelling reads every quote against the trade scope, matches its inclusions, exclusions and qualifications to the register, and lines the quotes up item by item. It shows where one quote has allowed for work the others left out. The estimator decides how each gap is carried.
On a healthcare tender, CIM Build levelled 6 trades in about 24 hours, where the senior estimator would normally allow 2 weeks.
What should a builder compare?
4 things decide it on a live tender. The longer checklist is in choosing AI tender levelling software.
1. Where the tender runs
With Procore, the tender stays in Procore from the invitation to the subcontract, and its agents work on the project data there.
CIM Build works on the documents wherever the project keeps them. It connects to Procore, Aconex, Autodesk Construction Cloud, SharePoint, Google Drive and Outlook, or you can upload the set directly.
2. What each quote is read against
Levelling needs a yardstick. Procore's agents read proposals against the specs and drawings, and the Bid Analyst Agent adds scope sheets. Procore's tender management analyses bids against the budget and bill of quantities.
CIM Build reads every quote against the scope register it built from the drawings and specification. On a healthcare tender, it found a six-figure dynamic pile load testing allowance that only 1 of the piling quotes had included. Every price on the table could then be compared on the same scope.
If the trade went out with a bill of quantities, the quotes that come back can be levelled against the same quantities.
3. What sits behind each flagged line
When you send a clarification, you need to show the subcontractor where the scope is drawn.
In CIM Build every line carries the sheet and clause it came from. Procore says its scope writer agent builds scope templates backed by direct links to the project documents.
4. What happens before the package is let
Both leave the decision with a person.
CIM Build exports the comparison to Excel and drafts the clarifications to send each subcontractor. Safeguard can hold the package, and its scope of works export, while quote exclusions against that trade are still untriaged. Your team chooses what the gate watches.
Can you use Procore and CIM Build together?
Yes. The documents stay in Procore. CIM Build connects to it, syncs the drawings and documents as they're issued and runs its audits on the current revision, with every finding traced back to the sheet and revision in Procore.
So the invitations, the award and the subcontract stay in Procore, and CIM Build reads each quote against a scope written from the documents. The same set gets the rest of the review too, with consultant reports and the PPR checked against the drawings.
For Procore AI beyond tendering, see Procore AI vs CIM Build. The integration questions are in AI drawing review with Procore, Aconex and SharePoint.
How do you test both on a tender you've already levelled?
Take a trade package you levelled by hand on a recent tender, with the quotes that came back. You know the answers, so you're testing the tools.
- Run the same drawings, specification and quotes through both.
- Put each result next to your own levelling sheet. Did it find the gaps you found, and any you missed?
- Open the source behind 3 flagged gaps in each.
- Time how long your estimator takes to check each result.
- Drop each export into your estimating template.
CIM Build is used by builders including AW Edwards, Reform Projects, Hurst Concepts and Lee & Co Constructions. Send us a trade package and the quotes that came back and we'll level them against your drawings.
Frequently asked questions
Is tender levelling the same as bid leveling? Yes. Bid leveling is the US term. Australian builders say tender levelling or quote levelling, and Procore's Australian site uses tender levelling.
Which Procore plan includes the tender levelling agent? Procore's support FAQ lists the Bid Leveling Agent among the 20 pre-built agents in the Procore AI Pro package, and says Enterprise includes the same agents. Check with Procore for your account.
Where does CIM Build store the quotes? CIM Build's standard hosted environment keeps customer data in Australia. Your documents, prompts and configured checks remain yours, they are not used to train models made available to other customers, and you can request deletion at any time and receive written confirmation. The sub-processor list, architecture overview and data processing terms are published at trust.cim.build.
How much does CIM Build cost? CIM Build prices per project or annually. Book a briefing for a quote.