Scope risk management
Drawings change faster than any one person can read them. CIM flags the scope gaps and unclouded changes on every revision and drafts the scope of works, RFIs and notices that follow. Your scope risk stays visible while there's still time to act.
Where scope risk starts
Every general contractor has the same problem
Your delivery team inherits the job in a one-hour meeting. The assumptions and exclusions the bid was priced on get talked through once, then live in a SharePoint folder - bid drawings, the estimate, sub quotes, addenda 1 through 6 - and in email threads scattered across the team. No single source of truth, and it's the assumptions that go missing first. Two years of revisions land on top of them, and nothing that follows reconciles back to what was priced.

Where it costs you
Margin erosion, project by project
Scope creep between revisions doesn't get picked up
Document review is prone to human error
The gap in your risk register
The bottleneck is human review capacity
Every revision lands as hundreds of sheets, and one person reads them between site walks and RFIs. The unclouded changes slip past the desk and surface months later as change orders you can't claim, while review capacity stays flat and your margin absorbs the difference.
Introducing CIM
Scope risk, managed from the handoff meeting to closeout
With CIM, your team gets through the analysis faster and catches more of what matters. Every revision comes back as flagged findings, cited to the page, ready to be signed off and sent straight to the right register - in your spreadsheets or in Aconex, Procore or ACC.
Swipe for the next screen
Design risks · L3 fit-out
Drawings read against the specification
Drawings
- A-301 Rev DLevel 3 plan
- A-501 Rev CWindow schedule
- A-601 Rev DDoor schedule
Specification
- Access cl. 4.2Corridor widths
- Glazing cl. 3.4Glass types by location
- Hardware cl. 5.2Fire door closers
Every sheet read against the clauses it touches. Each conflict lands in the register with the sheet and the clause beside it.
A-301 Rev D · Level 3 plan
Grid C · opened from DR-121
Corridor width at grid C: 3'-9" measured on the sheet, 4'-0" required by cl. 4.2.
Set read 14 Mar, 08:40 - 3 issues against the specification
Under the hood
How Construction Intelligence Management Is Built
Seven floors, built to house your project intelligence.
What your estimators priced, what your team assumed and every revision since all live in here. The stack runs on its own, on every revision that lands, and brings your team what it finds. Keep scrolling - the tower comes apart floor by floor.
Outcomes
Your commercial position stops depending on who remembered to check.
Every revision compared, every change cited to its sheet
Every set risk-screened before it becomes yours to build
Every document read as it lands, on every job you run
What the industry says
“CIM Build pointed to new opportunities to de-risk project documentation and procurement. It's pleasing to see how the transformation of construction is accelerating now that the serious players have embraced what good looks like. The days of starting projects with only part documentation are now in the rear view mirror.”

David Chandler OAM
Former NSW Building Commissioner
Why we built CIM
“I've sat through too many design meetings where everyone assumed someone else had checked it. Drawings were technically ‘issued’, procurement moved and the risk only showed up once money was already committed. CIM exists to identify those risks early - before they turn into arguments, delays, or margin erosion.”

Kevin Le
Co-Founder of CIM Build · a decade managing construction projects