Building Regulations assessment

The design assessed against the Building Regulations, clause by clause.

Only a fraction of the Building Regulations touches any one sheet, and working out which fraction is the job. A senior reads the set, holds the applicable provisions in their head, marks up what fails, and starts again when the next issue lands. The read is expensive, it sits inside a fixed fee, and the sheets at the end of it get less attention than the ones at the start.

CIM assesses the set against the provisions that apply to the building's class and construction type. The Building Regulations and the Approved Documents are preloaded, so the team can query them directly against the job. Each finding cites the clause, the sheet and the revision it was assessed against, so the reviewer is checking a conclusion rather than hunting for the evidence behind it.

Every sheet is assessed to the same standard, and the assessment re-runs on the next issue in minutes. The senior's time goes to the findings that need judgement, and the report that goes out carries a record of what was read.

What comes back

Clause by clause, with the measurement drawn on the sheet it was taken from.

CIM Build · Riverside Stage 2 · BCA assessment
ClauseRequirementResult
C3.4Fire doors to exit passageway, -/60/30Complies
D1.4Travel distance to a required exit, 40 m max40.605 m · A-2104
D2.13Stair treads and risers within permitted rangeComplies
E1.3Hydrant coverage to all parts of the floorNot demonstrated
F2.4Sanitary compartment clearances, AS 1428.1Designer statement
Furthest point40.605 m

D1.4 allows 40 m to a required exit. The path is drawn on the sheet it was measured from.

What it does for your team

  • Certifiers and surveyors

    Your report, populated from the assessment

    Clause-by-clause output written into your own report template, with compliance statuses your practitioners recognise.

  • Consultants

    Targeted checks, cited and checkable

    A specific question against a specific clause, with the sheet and the measurement shown, so a reviewer confirms it in seconds.

  • Builders

    Code risk found before it is built

    A clause the design misses costs rework at your cost. The assessment runs on each issue as the set develops.

Before CIM

  • Senior hours spent locating the provisions that apply before any assessment starts.
  • The last sheets in a set get a thinner read than the first.
  • Each reissue means starting the code read again.

With CIM

  • The whole set assessed against the provisions that apply to the job.
  • Every finding cited to the clause, the sheet and the revision.
  • The assessment re-runs on each issue, to the same standard.

Send a set. We'll assess it against the code and show you the clause behind every finding.

See CIM in action