Solution
Workspace
Spreadsheets and documents that behave like Excel and Word.
The business runs on workbooks and documents. The trade breakup, the RFI log, the tender comparison, the lessons learnt register, the letter that has to go out today - all of it is an .xlsx or a .docx that somebody has been formatting the same way for fifteen years, sitting on a drive away from the drawings it describes.
The workspace takes those files as they are. Drop an .xlsx or a .docx anywhere on the page and it imports. Sheets open in a grid with a formula bar, formula autocomplete, cell references, the drag-to-fill handle and undo, so a cadet who has used Excel is productive in the first ten minutes. Documents open in a normal editor. When something has to leave, it exports back out as .xlsx or .docx.
What the workspace adds is the project around it. The files sit in folders beside the drawing set, your own templates come across and get reused job to job, and a change asked for in plain English happens in the document with every AI edit highlighted for a person to accept or reject, line by line.
The tools your team already uses, inside the project
Excel and Word as they behave everywhere else, with the AI layer over the top and a version of every file kept against the job.
Project files
Trade breakup.xlsxv7
BCA report.docxv3
RFI log.xlsxv12
Consent conditions.docxv2
| Trade | Qty | Rate | |
|---|---|---|---|
| 03 | Blockwork | 1,240 m² | $186,000 |
| 04 | Waterproofing | 310 m² | $41,200 |
| 05 | Screed to wet areas | 310 m² | $28,900 |
| 06 | Tiling to wet areas | 310 m² | $52,400 |
Row 06 added by CIM from the scope register · accept or reject
AI layer
- Report template populated from the assessment
- Consent conditions pulled into an action checklist
- Every AI edit highlighted to accept or reject
Versions
v4 · v5 · v6 · v7 current
What it does for your team
Builders
Familiar interfaces, version-controlled
Excel and Word as your team already uses them, with every version of a workbook kept against the project rather than in someone's drive.
Certifiers and surveyors
Your report template, populated
The assessment output written into your own BCA report format, with compliance statuses your practitioners use, ready for review.
Consultants
The admin half of the report
Consent conditions pulled into action checklists and consultant PDFs checked for signatures, qualifications and revision matching.
Before CIM
- The trade breakup lives on a drive, away from the documents it prices.
- A new tool means a new format and a fortnight of everyone relearning.
- Every job rebuilds the same workbook from the last one by hand.
With CIM
- .xlsx and .docx in and out, with the formatting intact.
- Formulas, the fill handle and the shortcuts your team already knows.
- Your templates reused across projects, in folders beside the set.