Every consultant report, checked against the drawings.
A single job carries a stack of consultant reports - geotech, acoustic, ESD, fire, traffic, waste - and every one of them contains requirements the drawings are supposed to have picked up. Someone has to read all of it against the set. Under bid pressure that read reaches the reports the team already knows to worry about, and the rest get a skim.
CIM audits every report in parallel against the drawings and the specification, with the Owner's Project Requirements run as its own audit. The IBC and the state amendments that apply to the job are preloaded, so the team can query them directly. Each finding comes back with a reference box showing exactly what was reviewed - the clause, the sheet, the revision - and the findings table triages to reviewed, needs action, or future RFI.
The findings that surface are the ones that cost real money when they slip: an acoustic report calling STC 50 where the drawings show STC 45, or a geotech recommending CFA piles against bored piles in the structural notes. Those are cross-references a design manager works through drawing by drawing. Here the whole set is done in minutes and the RFI goes out on day two.
Before CIM
- Reports get read against the drawings where someone had the time.
- A requirement missed in a report is priced at nothing and paid for in delivery.
- Findings live in one reviewer's head or a marked-up PDF.
With CIM
- Every report audited against the drawings and the spec, in parallel.
- Each finding cited to the clause, the sheet and the revision it came from.
- A findings register that triages to reviewed, needs action, or RFI.
Customer story
Catching a $50K+ discrepancy before the package was awarded
A three-document coordination error - RW35 required, RW30 scheduled, no seals specified - caught, cited and confirmed before the window package was awarded.
Read the story