Recently released: Safeguard

Solution

Scope of works

A trade-by-trade scope register, built from the documents.

Scope between packages is where money leaks. The waterproofer prices to the drawings, the tiler prices to the drawings, and the screed between them belongs to whoever loses the argument on site. Writing a scope of works for every trade means reading the whole set once per trade, and there are thirty trades.

CIM reads the drawings and the specification into a scope register for each trade, with the sheet and clause behind every line. What the documents say about that trade is in one place, in the order the work happens.

Match the register against the quotes that come back and the exclusions line up against the scope they exclude. A gap between two packages shows up while both are still being negotiated, which is the only time it costs nothing to close.

What comes back

A scope register per trade, matched against the quotes that came in.

CIM Build · Riverside Stage 2 · Scope of works · Waterproofing
Scope itemSourceCovered
Membrane to all wet areas, class IIISpec 07 14 §2.1Both quotes
Screed to falls, wet areasA-2104 · detail 6Excluded by both
Puddle flanges to floor wastesH-4102 · detail 2Both quotes
Balcony upturns at door thresholdsA-5202 · detail 11One quote only

Quotes received

  • Aqua Seal3 exclusions
  • Coastline WP5 exclusions

Both quotes exclude the screed. It belongs to a package while both are still being negotiated.

What it does for your team

  • Builders

    The gap between two packages, before both are let

    A scope register per trade, matched against the quotes that come back, so the screed between trades has an owner.

  • Developers

    A complete package out to market

    What the documents say about each trade, in one place, before the job is priced.

  • Consultants

    What your set does and does not cover

    Trade by trade, with the sheet and clause behind every line.

Before CIM

  • Scope between trades gets settled on site, at your cost.
  • A scope of works per trade means reading the set thirty times.
  • Quote exclusions are read against memory of what the drawings show.

With CIM

  • A scope register for every trade, built from the documents.
  • Each line carrying the sheet and clause it came from.
  • Quotes matched against the register before packages are let.

Send a set and a subcontractor quote. We'll show you the scope it leaves uncovered.

See CIM in action

Find out what your current set is hiding